Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1854
Entry time:
Thursday, January 10, 2019, 10:45
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM2
Target/Number:
Subject:
TM2 is under vacum at TCS.
TCS: TP1, TP2 and TP1S are started.
ELOG V2.9.2-2455