  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  608   Tuesday, February 25, 2014, 06:53 David WangSouth Hot-CellRepairTM2 Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.Chad and I did the leak check   on
TM2 tube heater (+) water line  with
blank off and C-seal  installed on 
  
  609   Tuesday, February 25, 2014, 10:00 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.I did the helium pressure  test 
on TM2 tube heater (+) water line  with
blank off(C-seal) installed on  water
 10x 
  612   Thursday, March 06, 2014, 06:28 David WangConditioning StationMaintenanceTM1 TM1 had been moved from silo to CSTM1 has been successfully moved from silo
to CS. The CS vacuum system is connected 
to TM1. Turbo pumps on TM1 and CS have been
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  614   Thursday, March 06, 2014, 12:59 David WangConditioning StationMaintenanceTM1 Restart TM1 and CS TPs Restarted TM1 and CS turbo pumps after
the power off. Everything is fine .
  
  615   Thursday, March 06, 2014, 14:12 David WangConditioning StationStandard OperationTM1 TM1 air to vacuum and water lines leak check at CS.TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector  is hooked directly
 8x 
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been startedI connected ITW  vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so
  
  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.With TM4 located in ITW, All air to vacuum
seals  on ITW primary and  secondary
vacuum vessels have been leak  checked
 7x 
  632   Wednesday, March 26, 2014, 06:57 David WangSouth Hot-CellStandard OperationTM4Ta#42Leak check on TM4 HS water line with new Ta #42 target.Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4
  
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  
  646   Friday, April 11, 2014, 11:35 David WangConditioning StationStandard OperationTM3 Helium pressure test on TM3 HS water line with new Ta target. at CSThe helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response
 6x 
  649   Monday, April 14, 2014, 13:58 David WangITERepair  Reconnected ITE entrance moduleI reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE
  
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures.
 011.JPG025.JPG033.JPG035.JPG032.JPG 
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  
  661   Thursday, May 15, 2014, 14:38 David WangITERepairTM3TM3Bias short on ITEAnders and I opened the HV cover in ITE
and did  a visual check inside ITE HV 
cover and top of TM3.Bill was with us and
  
  673   Monday, June 02, 2014, 11:59 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 HS water line with new UC9# target installedChad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will
  
  675   Monday, June 02, 2014, 15:40 David WangConditioning StationStandard OperationTM1 TM1 and CS turbo pumps have been startedTM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges.
  