ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
608
|
Tuesday, February 25, 2014, 06:53 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | Chad and I did the leak check on
TM2 tube heater (+) water line with
blank off and C-seal installed on |
|
|
609
|
Tuesday, February 25, 2014, 10:00 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater (+) water line with blank off(C-seal) installed on WB. | I did the helium pressure test
on TM2 tube heater (+) water line with
blank off(C-seal) installed on water |
10x |
|
612
|
Thursday, March 06, 2014, 06:28 |
David Wang | Conditioning Station | Maintenance | TM1 | | TM1 had been moved from silo to CS | TM1 has been successfully moved from silo
to CS. The CS vacuum system is connected
to TM1. Turbo pumps on TM1 and CS have been |
|
|
613
|
Thursday, March 06, 2014, 06:58 |
David Wang | ITE | Maintenance | TM3 | | ITE vacuum and leak check on ITE BL2A window flange. | ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low |
|
|
614
|
Thursday, March 06, 2014, 12:59 |
David Wang | Conditioning Station | Maintenance | TM1 | | Restart TM1 and CS TPs | Restarted TM1 and CS turbo pumps after
the power off. Everything is fine . |
|
|
615
|
Thursday, March 06, 2014, 14:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 air to vacuum and water lines leak check at CS. | TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector is hooked directly |
8x |
|
616
|
Friday, March 07, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM3 | | TM3 and ITE air to vacuum leak check and TM3 water lines helium test. | With TM3 located in ITE, All air to vacuum
seals on ITE primary and secondary
vacuum vessel have been leak checked |
|
|
621
|
Thursday, March 13, 2014, 07:35 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITW turbo pumps have been started | I connected ITW vacuum system to
TM4. TM4 and ITW turbo pumps have been started
successfully. The pumping down is good so |
|
|
625
|
Wednesday, March 19, 2014, 15:46 |
David Wang | ITW | Standard Operation | TM4 | | TM4 and ITE air to vacuum leak check and TM4 water lines helium test. | With TM4 located in ITW, All air to vacuum
seals on ITW primary and secondary
vacuum vessels have been leak checked |
7x |
|
632
|
Wednesday, March 26, 2014, 06:57 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Leak check on TM4 HS water line with new Ta #42 target. | Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 |
|
|
644
|
Wednesday, April 09, 2014, 11:10 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 heat shield circuit leack check at SHC | This Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec, |
|
|
646
|
Friday, April 11, 2014, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Helium pressure test on TM3 HS water line with new Ta target. at CS | The helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response |
6x |
|
649
|
Monday, April 14, 2014, 13:58 |
David Wang | ITE | Repair | | | Reconnected ITE entrance module | I reconnected the entrance module back
to the ITE station. All diagnostic cables,
turbo- pump, air lines, water lines on ITE |
|
|
655
|
Monday, May 05, 2014, 13:05 |
David Wang | ITE | Repair | TM3 | | ITE target module flange seal has been replaced. | ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before |
|
|
656
|
Monday, May 05, 2014, 13:11 |
David Wang | ITE | Repair | TM3 | | ITE Entrance module has been disconnected. | ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures. |
|
|
658
|
Wednesday, May 07, 2014, 10:08 |
David Wang | ITE | Repair | TM3 | | ITE entrance module flange seal had been replaced. | ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the |
7x |
|
659
|
Wednesday, May 07, 2014, 10:15 |
David Wang | ITE | Repair | TM3 | | ITE TM3, entrance module and BL2A3 window flange seals leak check.. | ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The |
|
|
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE | Anders and I opened the HV cover in ITE
and did a visual check inside ITE HV
cover and top of TM3.Bill was with us and |
|
|
673
|
Monday, June 02, 2014, 11:59 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new UC9# target installed | Chad and I leak checked TM1 HS and UC9#
VCR fittings. No response had been found
on leak detector during the test. I will |
|
|
675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|