ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine.
  
  1666   Wednesday, December 13, 2017, 15:32 Anders MjosAssembly/Bench TestMaintenanceTM2 Source Tray inspectionThe Source tray was inspected in the RH
shop today by Anders, Friedhelm and Jens.
The routing of the lines are satisfactory,
  
  1670   Friday, December 22, 2017, 11:09 Anders MjosITWStandard OperationTM2 Shut down High Active Cooling waterStopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off
  
  1677   Tuesday, January 16, 2018, 10:36 Anders MjosSpent Target VaultStandard OperationTM2 Old TM2 Source Tray moved to Cyclotron basementThe old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The
  
  1686   Tuesday, February 13, 2018, 13:56 Anders MjosITWStandard OperationTM2Ta#55Target module disconnectedTM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR
  
  1687   Wednesday, February 14, 2018, 10:06 Anders MjosITWMaintenanceTM2 Replaced parker couplings on Window cooling lineBy Anders & David. Couplings will be
taken apart for inspection.
  
  1688   Friday, February 16, 2018, 13:46 Anders MjosITWMaintenanceTM2 Parker coupling inspectionFindings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico.
 Used_Parker_FS251_Inspection.pdf 
  1691   Tuesday, March 06, 2018, 09:53 David WangITWStandard OperationTM2 Tm2 and Tm4 vacuum disconnectionThe job is done. See attachment.  TM2_TM4_disconnection_Vacuum.pdf 
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1723   Thursday, May 24, 2018, 15:19 Keith C NgAssembly/Bench TestRepairTM2 tm 2 source tray buildAttached alignment check notes after brazing
and fabrication.
First page lower half shows establishment
 20180524_alignmentcheckresults.pdf 
  1724   Friday, May 25, 2018, 11:41 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  1726   Wednesday, May 30, 2018, 09:51 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS.I did a helium pressure test on  TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this  test is a reference check
  
  1727   Wednesday, May 30, 2018, 09:55 David WangConditioning StationRepairTM2 TM2 and TCS vacuum pumps are switched off.I switched off TM2 and TCS vacuum pumps.
The TCS and TM2 will be under vacuum without
pumping.
  
  1733   Friday, June 08, 2018, 11:36 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Removal ProgressThe containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced.
 TM2_06082018.jpg 
  1734   Friday, June 08, 2018, 14:24 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1735   Monday, June 11, 2018, 11:30 chad fisherSouth Hot-CellRepairTM2 TM2 containment box onTm2 containment box has been re-installed
onto TM2.
  
  1736   Tuesday, June 12, 2018, 11:26 chad fisherSouth Hot-CellRepairTM2 TM4 Optics TrayI have "slung" the TM4 optics
tray in preparation for its removal.
 fh.jpg 
  1743   Wednesday, June 27, 2018, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM2 has been moved from the silo
to the south hot cell.
  
  1745   Friday, June 29, 2018, 10:15 chad fisherSouth Hot-CellStandard OperationTM2 TM2 work and target installOn Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was
  
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached.
 TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf 