527
|
Friday, October 25, 2013, 06:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Maico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because |
|
531
|
Thursday, October 31, 2013, 10:36 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITE to ITW. | I moved 5 shielding blocks from ITW to
ITE. The ITW is configured to take
proton beam. |
|
536
|
Wednesday, November 06, 2013, 10:41 |
David Wang | South Hot-Cell | Repair | TM2 | | Installed 2 turbopumps on TM2 | Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation. |
|
537
|
Tuesday, November 12, 2013, 09:51 |
David Wang | ITE | Standard Operation | TM3 | | TM3 disconnection | TM3 has been disconnected this morning
and purged all HV water lines. I found
the power plug for all turbo pump fans wasnt |
|
542
|
Wednesday, November 13, 2013, 10:01 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 leak check at conditioning station | I leak checked TM2 at conditioning station
this morning. All air to vacuum seals on
the top of the module are good. All water |
|
549
|
Tuesday, November 19, 2013, 14:24 |
David Wang | ITE | Repair | | | ITE TP3 | Hi
all, The old ITE TP3 pump is
moved out and the new pump is in |
|
563
|
Tuesday, December 03, 2013, 09:58 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITW to block storage area. | I moved 5 shielding blocks from ITW to
block storage area. |
|
567
|
Wednesday, December 04, 2013, 11:05 |
David Wang | ITW | Standard Operation | TM4 | Ta41# | I disconnected TM4 in ITW | I disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose. |
|
568
|
Wednesday, December 04, 2013, 11:15 |
David Wang | ITE | Repair | TM4 | | New bolts are installed on ITE TP3. | I installed 8 new bolts(3/8-16 UNC x1.25
STL) on the ITE TP3. The ITE TP3 replacement
job is done. Everything is connected back |
|
573
|
Thursday, December 05, 2013, 14:55 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Chad and I leak checked TM4 heat shied
water circuit at SHC. The pumping down was
very good.Base leak rate 0.0xe-9 atm.cc/sec. |
|
574
|
Thursday, December 05, 2013, 14:57 |
David Wang | ITE | Standard Operation | TM4 | | Connected TM4 in ITW | I connected TM4 in ITE. All turbo pumps
have been started and wok fine including
new TP3. Everything is good so far. |
|
577
|
Monday, December 09, 2013, 14:47 |
David Wang | ITE | Standard Operation | TM4 | | I moved 5 shielding blocks from block storage area to ITE. | I moved 5 shielding blocks to ITE. The
ITE is configured to take proton beam. |
|
581
|
Monday, January 20, 2014, 13:35 |
David Wang | ITE | Standard Operation | TM4 | | 5 shielding blocks had been moved out of ITE | 5 SHIELDING BLOCKS HAD BEEN MOVED OUT OF
ITE.AIR SAMPLE AND SWIPED FIRST BLOCK AND
ITE PIT.NOTHING HAD BEEN FOUND ON ALPHA MONITOR |
|
582
|
Monday, January 20, 2014, 13:38 |
David Wang | ITE | Standard Operation | TM4 | | DISCONNECTED TM4 IN ITE. | I DISCONNECTED TM4 IN ITE. ALL WATER LINES
HAD BEEN PURGED OUT WITH PRESSURE AIR. |
|
586
|
Wednesday, January 22, 2014, 10:51 |
David Wang | ITE | Repair | | | Removed 4 shielding blocks located on top of preseperator in TH | Travis and I removed 4 shielding blocks
located on top of pre-seperator in
TH. This is a job for ITE harp 9 re-installation |
|
591
|
Tuesday, February 04, 2014, 08:04 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line. | Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak |
 |
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both |
10x |
593
|
Wednesday, February 05, 2014, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line from inside service cap in TH. | Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec, |
  |
597
|
Thursday, February 13, 2014, 09:24 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line with rubber insert blocked WB in SHC | Chad and I did the Leak checked TM2
tube heater (+) water line with rubber
insert plugged water block on " D" |
   |
598
|
Thursday, February 13, 2014, 13:30 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did the pressure test on TM2tube
heater+(D) water line at SHC with shop
air.We tested from 30psi to 80psi on both |
|