ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical CheckElectrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details.
 TM2_Ta54_elec_chk_SHC.PDF 
  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installedContainment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high
  
  1628   Wednesday, September 27, 2017, 09:02 Travis CaveConditioning StationStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the south hot cell to the conditioning station.
  
  1629   Thursday, September 28, 2017, 10:50 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 window and HS water lines at TCS.  I did helium pressure test on TM2
containment box window and HS  line at TCS.
@ 70psi helium  for 3 minutes, HS:2.2XE-7
  
  1631   Thursday, September 28, 2017, 15:34 Anders MjosConditioning StationDevelopmentTM2 Changes to MP3 startup Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a
  
  1632   Thursday, September 28, 2017, 17:44 Anders MjosConditioning StationStandard OperationTM2Ta#54Conditioning Ta#54Thursday, September 28, 2017
Cooling water not yet connected to
TM.
 Ta#54.docxTa#54_BIAS_current_vs_voltage.xlsx 
  1633   Tuesday, October 03, 2017, 09:29 Travis CaveITWStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station.
  
  1654   Tuesday, November 07, 2017, 10:11 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the west target station to the south hot
cell.
  
  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak.  It was helium pressurized
  
  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCSTCS vacuum system and water system have
been started as well. Everything looks fine.
  
  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed
  
  1659   Monday, November 13, 2017, 13:39 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54 and #55Electrical Check The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with
 TM2-Ta54-_Electrical_Check_SHC_Post_Beam.pdfTM2-no_target-_Electrical_Check_SHC_Nov_2017.pdfTM2-Ta55_Electrical_Check_SHC.pdf 
  1661   Tuesday, November 14, 2017, 10:01 Travis CaveITWStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access
  
  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine.
  
  1666   Wednesday, December 13, 2017, 15:32 Anders MjosAssembly/Bench TestMaintenanceTM2 Source Tray inspectionThe Source tray was inspected in the RH
shop today by Anders, Friedhelm and Jens.
The routing of the lines are satisfactory,
  
  1670   Friday, December 22, 2017, 11:09 Anders MjosITWStandard OperationTM2 Shut down High Active Cooling waterStopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off
  
  1677   Tuesday, January 16, 2018, 10:36 Anders MjosSpent Target VaultStandard OperationTM2 Old TM2 Source Tray moved to Cyclotron basementThe old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The
  
  1686   Tuesday, February 13, 2018, 13:56 Anders MjosITWStandard OperationTM2Ta#55Target module disconnectedTM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR
  
  1687   Wednesday, February 14, 2018, 10:06 Anders MjosITWMaintenanceTM2 Replaced parker couplings on Window cooling lineBy Anders & David. Couplings will be
taken apart for inspection.
  
  1688   Friday, February 16, 2018, 13:46 Anders MjosITWMaintenanceTM2 Parker coupling inspectionFindings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico.
 Used_Parker_FS251_Inspection.pdf 