  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  720   Thursday, July 31, 2014, 08:08 chad fisherSouth Hot-CellStandard OperationTM3SiC#30SiC#30 Removed and inpectSiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not  yield
any obvious signs of damage.
 TM320140731_01.jpgTM320140731_02.jpgTM320140731_03.jpgTM320140731_04.jpg 
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installedUcx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4
  
  770   Monday, October 20, 2014, 14:18 chad fisherSouth Hot-CellRepair  Manipulator RepairThe broken cable on the east manipulator
has been replaced.
The handle will need some adjustments
  
  771   Tuesday, October 21, 2014, 08:55 chad fisherSouth Hot-CellRepair  Manipulator repairThe east manipulator handle has been adjusted
and is ready for use.
  
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  789   Monday, November 17, 2014, 13:45 chad fisherSouth Hot-CellRepair  Jig for roof install of targetJig for installation of target through
hot cell roof has been assembled and placed
in the target hall.
 Target_roof_install_20141117_01.jpgTarget_Roof_install_Jig_20141117_02.jpgTarget_roof_install_20141117_03.jpgTarget_roof_install_20141117_04.jpg 
  793   Wednesday, November 19, 2014, 08:49 chad fisherSouth Hot-CellStandard OperationTM4UCx#11Ta#44 Removed Ucx#11 InstalledTa#44 has been removed from TM4 and UCx#11
has been installed and is ready for testing.
New fasteners were installed for
  
  805   Monday, December 01, 2014, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 REFURB. WATER LOOP TESTSome issues with the turntable and having
to wait for a decision on whether to remove
TM2 from the hot cell so that TM4 with dead
 TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg 
  807   Tuesday, December 02, 2014, 10:15 chad fisherSouth Hot-CellRepairTM2 TM2 Reburb. Loop InstallFinal polish, clean with methanol and clean
compressed air.
Loop installed and torqued to 90
 TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg 
  831   Thursday, January 08, 2015, 10:34 chad fisherSouth Hot-CellStandard Operation  TM2 Tray Build Status and ProblemsFinal assembly of the source tray for TM2
was started this morning.
Sliding tray was received from keensert
 TM2_Tray_20150108_09.jpgTM2_Tray_20150108_10.jpgTM2_Tray_20150108_11.jpgTM2_Tray_20150108_12.jpg 
  833   Monday, January 12, 2015, 14:29 chad fisherSouth Hot-CellRepairTM2 TM2 Tray Build StatusCountersink problem with supports has been
remedied. Scratches, dings, and pitting has
been buffed out and supports re-cleaned and
 TM2_Tray_20150112_01.jpg 
  834   Tuesday, January 20, 2015, 13:45 chad fisherSouth Hot-CellRepairTM2 TM2 Tray AlignmentTM2 Tray Alignment is complete except for
verification with alignment tray.
First attempt results were:
 TM2Alignment_Target_Front_Jan_20.jpgTM2_Alignment_Target_Rear_Jan_20.jpg 
  835   Monday, January 26, 2015, 09:36 chad fisherSouth Hot-CellRepairTM2 TM2 Tray AlignmentTM2 tray alignment was confirmed with the
alignment tray this morning:
Front target 0.000 vertically, 0.000
 TM2_Tray_20150126_090448.jpg 
  837   Thursday, January 29, 2015, 11:31 chad fisherSouth Hot-CellRepairTM2 TM2 Tray BuildOn Tuesday morning I attempted to complete
assembly of the source tray for TM2 however
discovered that 3 1/4-20 x 0.25 titanium
 TM2_Tray_20150126_112232.jpg 
  838   Monday, February 02, 2015, 09:59 chad fisherSouth Hot-CellRepairTM2 TM2 Tray BuildMissing heli coils installed this morning.
Threads had to be chased with tap
for 1/4-20 heli coil and missing countersinks
  
  839   Monday, February 02, 2015, 14:06 chad fisherSouth Hot-CellRepairTM2 TM2 Tray buildMaster target jig installed to locate attachment
bracket ITA3389 as well as conductor insulator
block b (aluminum / for soldering version)
 TM2_Tray_20150202_134752.jpgTM2_Tray_20150202_134759.jpg 
  842   Wednesday, February 11, 2015, 13:13 chad fisherSouth Hot-CellMaintenance  New gas bottle storage rackThe new gas bottle storage rack has been
installed by/for the south hot cell.
 
 20150211_115656.jpg 
  850   Friday, February 27, 2015, 09:34 chad fisherSouth Hot-CellMaintenance  Hot cell Entry February 25 2015See attached report.
Summary:
Radio problems just before entry
 ISAC_South_Hot_Cell_Entry.pdf 