Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 720     Entry time: Thursday, July 31, 2014, 08:08
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: SiC#30 
Subject: SiC#30 Removed and inpect 

SiC#30 has been removed from TM3. A quick exam of TM3 source tray did not  yield any obvious signs of damage.

9 pin connector on the target showed the usual sparking/arcing marks.

Heat shield has been removed from the target. Inside of heat shield has some unusual marks on it and quite a lot of black deposits.

 

Attachment 1: TM320140731_01.jpg  1.056 MB  | Show | Hide all
Attachment 2: TM320140731_02.jpg  1.055 MB  | Show | Hide all
Attachment 3: TM320140731_03.jpg  917 kB  | Show | Hide all
Attachment 4: TM320140731_04.jpg  898 kB  | Show | Hide all
ELOG V2.9.2-2455