Message ID: 838     Entry time: Monday, February 02, 2015, 09:59
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: TM2 Tray Build 

Missing heli coils installed this morning.

Threads had to be chased with tap for 1/4-20 heli coil and missing countersinks hand applied to allow for installation. Care was taken to ensure no "swarf" was spread and operation was super clean. Chased holes blown out with canned air and a vacuum placed on the other side.

Final assembly can and will now continue.