Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 789     Entry time: Monday, November 17, 2014, 13:45
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module:  
Target/Number:  
Subject: Jig for roof install of target 

Jig for installation of target through hot cell roof has been assembled and placed in the target hall.

Attachment 1: Target_roof_install_20141117_01.jpg  1.085 MB  | Show | Hide all
Attachment 2: Target_Roof_install_Jig_20141117_02.jpg  979 kB  | Show | Hide all
Attachment 3: Target_roof_install_20141117_03.jpg  1.097 MB  | Show | Hide all
Attachment 4: Target_roof_install_20141117_04.jpg  1.544 MB  | Show | Hide all
ELOG V2.9.2-2455