ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  251   Friday, March 01, 2013, 11:35 David WangITEMaintenanceTM4 Leak check on ITE and TM4. The
leak  check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum  vessel 
  
  254   Wednesday, March 06, 2013, 14:12 David WangITWRepair  ITW EXIT1 tank to module o-ring replacement ITW
EXIT1  o-ring replacement is fininshed today.
The ITW EXIT 1 is back to ITW. The old o-ring
  
  262   Thursday, March 14, 2013, 07:09 David WangSouth Hot-CellStandard OperationTM4 TM4 electrical test at SHC after windown and containment box back.TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. 
  
  263   Thursday, March 14, 2013, 07:18 David WangSouth Hot-CellStandard OperationTM4 TM4 window cooling line leak checkIt took a long time(more than 1 hour)  
to pump down the TM4 window  cooling
line during leak check time. The base leak
  
  272   Wednesday, March 20, 2013, 08:19 David WangConditioning StationRepairTM4 Leak check new installed TM4 TP1 at conditioning station.I leak checked new installed TM4 TP1 at
conditioning station. The CS vacuum gauges
reading were at 1.0-1.5xE-6 torr . Leak detector
  
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  284   Wednesday, April 03, 2013, 12:26 David WangITEMaintenanceTM4Sic LIS/RFQLeak check on ITE TM4.TM 4 had been leak check in ITE due to
  relatively high PNG1 and IG1 readings.All
TM4 primary and secondary  vessel air
  
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  295   Friday, April 12, 2013, 10:27 David WangITWStandard OperationTM1 I reconnected TM1 to ITW.TM1 has been reconnected in ITW. Water
interlock check for TM1 is done.
  
  296   Friday, April 12, 2013, 10:32 David WangITWRepairTM1 ITW EXIT1 tank to module o-ring leak check.I leak checked new installed ITW EXIT1
tank to module o-ring.No leak had been found
. Also ,TM1 primary vessel air to vacuum
  
  302   Wednesday, April 17, 2013, 10:35 David WangITEStandard OperationTM4 I moved 5 shielding blocks back to ITE.5 shielding block had been moved 
back to ITE. The ITE is configured to take
proton beam.
  
  310   Monday, April 22, 2013, 09:33 David WangConditioning StationRepairTM3 Leak check TM3 at conditioning stationTM3 leak check at conditioning station
without target: TM3 all air to vacuum seals
have been leak checked . They are all good.
  
  331   Tuesday, May 07, 2013, 12:07 David WangITWStandard OperationTM1 I moved 5 shielding blocks from ITE to ITW.Water interlock check  on ITW is done.
All water signals are strong on EL panel. 
ITW is configured to take proton beam.
  
  343   Wednesday, May 15, 2013, 10:00 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.HS had been purged. The ITE is under venting.
The TM4 will be moved to SH on next Tuesday
which is May 21th.
  
  358   Thursday, May 23, 2013, 11:14 David WangSouth Hot-CellStandard OperationTM4TA#40 TM4 TA# 40 HS leak check at SHCTM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be  a helium pressure test on it at
  
  371   Wednesday, May 29, 2013, 06:32 David WangITEStandard OperationTM4Ta#40TM4 has been connected in ITE.TM4 has been connected in ITE. The pumping
down is fine so far.TM4 water interlock check
was done yesterday.
  
  374   Tuesday, June 04, 2013, 12:36 David WangITEStandard OperationTM4 5 shielding blocks are transferred from ITW to ITEDan an I  transferred 5 shielding
blocks from ITW to ITE. The ITE is configured
to take proton beam.
  
  376   Tuesday, June 11, 2013, 10:05 David WangITWStandard OperationTM1 Disconnected TM1 in ITW.Dan and I  disconnected TM1 in ITW.   
  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shieldChad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far.
  