Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 209     Entry time: Thursday, November 08, 2012, 08:42
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: TiC #3 
Subject: TM1 TiC #3 target heat shield helium pressure check is done. 

TM1 TiC #3 target  heat shield  helium pressure check  is done at conditioning station. Applied 80 psi helium to HS circuit for 5 minutes . There is no response had been found on leak detector. The leak detector base LR 0.0x E-9 atm.cc/sec, and BP 0.0xE-4 torr. CS and TM1 vacuum are at low E-6 torr range. The HS circuit is leak tight.

ELOG V2.9.2-2455