Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 190     Entry time: Tuesday, October 02, 2012, 11:47
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: Nb#7 
Subject: I moved 5 shielding blocks from ITE to ITW. 

5 shielding blocks have been moved from ITE to ITW. ITW is configured to take proton beam now.

ELOG V2.9.2-2455