2594
|
Tuesday, May 21, 2024, 11:46 |
David Wang | ITW | Standard Operation | TM4 | LP febiad empty. | Tm4 has been moved from ITW to SHC. | Tm4 has been moved from ITW to SHC. the
move is smooth. |
|
|
89
|
Thursday, April 19, 2012, 09:48 |
David Wang | South Hot-Cell | Standard Operation | TM1 | LP SIS Nb 6 | leak check heat shield circuit | Chad and I did a leak check on TM1 Nb5
target heat shield circuit. The leak detector
was connected to heat shield circuit.The |
|
|
17
|
Tuesday, August 02, 2011, 09:41 |
Pierre Bricault | Conditioning Station | Repair | TM1 | ITW-TM1-Ta#37-LP-SIS | Test high voltage on TM1 | TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6 |
|
|
1532
|
Wednesday, May 10, 2017, 14:00 |
Anders Mjos | South Hot-Cell | Development | | ITE-Ta-LP-FEBIAD | Test target examination | Chad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed. |
|
|
2251
|
Monday, September 27, 2021, 14:29 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #3 | Module move | TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target |
|
|
2105
|
Thursday, June 18, 2020, 09:11 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station. |
|
|
2110
|
Thursday, June 25, 2020, 09:45 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station. |
|
|
2127
|
Friday, July 24, 2020, 09:43 |
Travis Cave | Conditioning Station | Maintenance | TM2 | Graphite #1 | Module move | TM#2 has been moved from the west
station to the conditioning station. ITW
entrance module moved will take place on |
|
|
2131
|
Thursday, July 30, 2020, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
back to the west target station from the
conditioning station. |
|
|
2137
|
Tuesday, August 25, 2020, 09:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell. |
|
|
2141
|
Thursday, August 27, 2020, 11:14 |
Travis Cave | Spent Target Vault | Standard Operation | | Graphite #1 | Spent Target Move | Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails. |
|
|
2326
|
Wednesday, May 25, 2022, 13:43 |
Frank Song | ITW | Standard Operation | TM2 | Febiad-Test | module disconnection | TM2 with a test target was disconnected
in ITW. |
|
|
2316
|
Thursday, April 28, 2022, 07:24 |
Frank Song | ITW | Standard Operation | TM2 | Febiad Test Target | Module Connection | TM2 was connected in ITW with a Febiad
Test Target. |
|
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET | A Test Febiad Target was installed
and checked at SHC. |
|
|
1117
|
Friday, November 06, 2015, 14:36 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the |
|
|
1121
|
Tuesday, November 10, 2015, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | FEBIAD test target | Testing TM3 | Tuesday, November 10, 2015, 16:53: Roughing
Tuesday, November 10, 2015, 18:24:
TP1S started |
|
|
1045
|
Friday, August 21, 2015, 11:38 |
Anders Mjos | South Hot-Cell | Repair | TM2 | FEBIAD Test Target | Steerer wires found to be touching the gas lines | Yesterday TM2 was inspected in the SHC.
Spark marks were found both on the steerer
wires and on the ANODE wire. The steerer |
|
|
1119
|
Monday, November 09, 2015, 16:47 |
Anders Mjos | Conditioning Station | Maintenance | TM3 | FEBIAD Test Target | Leak check of Service Cap | Service cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.
Connected to the backing line with IG1 at |
|
|
1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check | Target to Anode and target to Common showed
~ 500 kOhm values. No leaks above 3E-9 atm-cc/s
seen. See attached. |
|
|
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning | Problem found between ANODE (F) and
chassis 90 kOhm. See attachment for details. |
|