Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1690     Entry time: Monday, March 05, 2018, 13:47
Author: Travis Cave 
Category: Spent Target Vault 
Type: Repair 
Module:  
Target/Number: Many 
Subject: Spent Target Assay 

 The spent target assay was aborted today after the first target was finished due to the very old computer that controls the camera and the vault door effectively died. The vault door had to be closed using the emergency door closing winch which worked so it passed that test.

ELOG V2.9.2-2455