Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2251     Entry time: Monday, September 27, 2021, 14:29
Author: Travis Cave 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: Graphite #3 
Subject: Module move 

 TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days.

ELOG V2.9.2-2455