116
|
Tuesday, June 05, 2012, 15:06 |
Bevan Moss | ITW | Standard Operation | TM1 | Nb#6 | Module move from ITW to SHC | TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people |
|
|
122
|
Friday, June 08, 2012, 15:00 |
Don Jackson | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical Check Nb#6 at end of run | Megger check values were low but still
within operational range. |
|
|
124
|
Monday, June 11, 2012, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#6 | Spent target move | The Nb#6 target has been moved from the
south hot cell into storage. It was place
in pail #95 and is in slot 5C of the vault. |
|
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. | Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. |
|
|
2166
|
Thursday, November 19, 2020, 09:00 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#6 | Helium pressure check on TM2 HS line at TCS. | LD 0.0 Xe-9 atm.cc/sec , 70 psi helium
3 minutes. No leak. |
|
|
2480
|
Monday, August 28, 2023, 12:16 |
Frank Song | North Hot-Cell | Repair | TM2 | Nb#11 | electric/leak check | TM2 with new target Nb#11 has been
E/L checked sitting on NHC. |
|
|
2481
|
Tuesday, August 29, 2023, 09:07 |
Frank Song | ITW | Repair | TM2 | Nb#11 | electrical check | TM2 with new target Nb#11 replaced
has been electric checked one more time in
ITW. |
|
|
2482
|
Tuesday, August 29, 2023, 09:28 |
Frank Song | ITW | Repair | TM2 | Nb#11 | Module Connection | Module was connected yesterday and
all turbo pumps are running at their top
speed. |
|
|
2490
|
Tuesday, October 03, 2023, 07:56 |
Frank Song | ITW | Standard Operation | TM2 | Nb#11 | module disconnection | TM2 with target Nb#11 has been disconneted
in ITW. The HS line was purged with Nitrogen
in station. |
|
|
2491
|
Tuesday, October 03, 2023, 14:28 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Nb#11 | electrical check | An electric checked right after TM2
was moved from ITW. |
|
|
2494
|
Friday, October 06, 2023, 10:47 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#11 | Spent Target Move | The spent Nb#11 target was removed
from the south hot cell and place in the
spent target vault. It was placed in pail |
|
|
2474
|
Wednesday, August 09, 2023, 09:41 |
David Wang | North Hot-Cell | Standard Operation | TM2 | Nb#10 | TM2 Nb# 10 electrical and leak check at NHC | Nb#10 has been installed on TM2 . electrical
and leak check on HS line are good. See attachment. |
|
|
2475
|
Wednesday, August 09, 2023, 13:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#10 | Tm2 Nb#10 has been connect at TCS. | TM2 Nb#10 has been connect at TCS. TCS
water system and vacuum system have been
started. Everything looks ok so far. TCS |
|
|
2477
|
Tuesday, August 15, 2023, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | Nb#10 | Module Connection | TM2 with new target Nb#10 was moved
to ITW from TCS and re-connected in pit.
TPs are running at their full speed. |
|
|
2479
|
Friday, August 25, 2023, 07:22 |
Frank Song | ITW | Repair | TM2 | Nb#10 | module disconnection | TM2 with target Nb#10 was disconnected
in ITW yesterday for beam production issue
investigation. |
|
|
2627
|
Thursday, June 27, 2024, 09:49 |
David Wang | North Hot-Cell | Standard Operation | | Nb#10 | Nb#10target has been remotely transferred from NHC to SHC. | Nb#10target has been remotely transferred
from NHC to SHC. |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
2670
|
Monday, August 26, 2024, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#10 | Spent Target Move | Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when |
|
|
59
|
Friday, November 18, 2011, 16:29 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | N/A | High Voltage (HV) testing | TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module |
|
|
129
|
Wednesday, June 20, 2012, 11:39 |