Entry  Tuesday, June 05, 2012, 15:06, Bevan Moss, ITW, Standard Operation, TM1, Nb#6, Module move from ITW to SHC 
 TM1 has been moved from ITW to the SHC. The move did encounter some issues, one of the railings for preventing people from falling into the MAA
was hit with the containment box. This caused the module to rotate. The module rotated ~90 degrees before the problem was noticed. The module was backed
off from the post once noticed but had already freely rotated. The box was inspected with the cameras prior to being inserted into the SHC. No damage was
Entry  Friday, June 08, 2012, 15:00, Don Jackson, South Hot-Cell, Standard Operation, TM1, Nb#6, Electrical Check Nb#6 at end of run Nb#6_End_of_Run.JPG
Megger check values were low but still within operational range.
Entry  Monday, June 11, 2012, 10:52, Travis Cave, Spent Target Vault, Standard Operation, , Nb#6, Spent target move Vault_Storage_June_11_2012.pdf
The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more
details.
Entry  Wednesday, November 18, 2020, 15:28, David Wang, South Hot-Cell, Standard Operation, TM2, Nb#6, electrical check and HS leak check. Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png
Everything looks good. A still short to P before target installation. We will float P,Q as before on module top. 
Entry  Thursday, November 19, 2020, 09:00, David Wang, Conditioning Station, Standard Operation, TM2, Nb#6, Helium pressure check on TM2 HS line at TCS. 
LD 0.0 Xe-9 atm.cc/sec , 70 psi helium 3 minutes.  No leak.
Entry  Monday, August 28, 2023, 12:16, Frank Song, North Hot-Cell, Repair, TM2, Nb#11, electric/leak check TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
 TM2 with new target Nb#11 has been E/L checked sitting on NHC.
Entry  Tuesday, August 29, 2023, 09:07, Frank Song, ITW, Repair, TM2, Nb#11, electrical check TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.
Entry  Tuesday, August 29, 2023, 09:28, Frank Song, ITW, Repair, TM2, Nb#11, Module Connection TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
 Module was connected yesterday and all turbo pumps are running at their top speed. 
Entry  Tuesday, October 03, 2023, 07:56, Frank Song, ITW, Standard Operation, TM2, Nb#11, module disconnection TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 
Entry  Tuesday, October 03, 2023, 14:28, Frank Song, South Hot-Cell, Standard Operation, TM2, Nb#11, electrical check TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
 An electric checked right after TM2 was moved from ITW. 
Entry  Friday, October 06, 2023, 10:47, Travis Cave, Spent Target Vault, Standard Operation, , Nb#11, Spent Target Move Target_Index_2023-10-06.pdf
 The spent Nb#11 target was removed from the south hot cell and place in the spent target vault. It was placed in pail #283 and place in spot 7B
is was 65.7mSv/hr upon removal. see pdf for further vault details.
Entry  Wednesday, August 09, 2023, 09:41, David Wang, North Hot-Cell, Standard Operation, TM2, Nb#10, TM2 Nb# 10 electrical and leak check at NHC Nb_#10_electrical_and_leak_check_at_NHC.pdf
Nb#10 has been installed on TM2 . electrical and leak check on HS line are good. See attachment.
Entry  Wednesday, August 09, 2023, 13:13, David Wang, Conditioning Station, Standard Operation, TM2, Nb#10, Tm2 Nb#10 has been connect at TCS. 
TM2 Nb#10 has been connect at TCS. TCS water system and vacuum system have been started. Everything looks ok so far. TCS Faraday cage is secured for
TM2 conditioning at TCS. 
Entry  Tuesday, August 15, 2023, 13:58, Frank Song, ITW, Standard Operation, TM2, Nb#10, Module Connection TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
 TM2 with new target Nb#10 was moved to ITW from TCS and re-connected in pit. TPs are running at their full speed. 
Entry  Friday, August 25, 2023, 07:22, Frank Song, ITW, Repair, TM2, Nb#10, module disconnection TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
 TM2 with target Nb#10 was disconnected in ITW yesterday for beam production issue investigation.
Entry  Thursday, June 27, 2024, 09:49, David Wang, North Hot-Cell, Standard Operation, , Nb#10, Nb#10target has been remotely transferred from NHC to SHC.  
Nb#10target has been remotely  transferred from NHC to SHC.  
Entry  Tuesday, August 20, 2024, 11:53, Carla Babcock, South Hot-Cell, Standard Operation, , Nb#10, Nb#10 PIE 
Nb#10 never worked online - repeller had no effect on the beam and one of the RF wires was touching HVC. Max 60pA was seen on the source cup. See notes
here ITW-TM2-Nb#10/#11-LP-IGLIS 
(Web
Entry  Monday, August 26, 2024, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Nb#10, Spent Target Move Target_Index_2024-08-26.pdf
 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC.
See attached PDF for vault details.
Entry  Friday, November 18, 2011, 16:29, Bevan Moss, Conditioning Station, Standard Operation, TM1, N/A, High Voltage (HV) testing TM1_High_Voltage_Test_Nov_16_2011.JPG
 TM1 was high voltage tested without a target on November 16, 2011 with Don Jackson, Pierre Bricault, and Bevan Moss. The module was able to hold
up to 25 kV but between that and 32 kV there was lots of discharge which could be measured in the vacuum. See the attached plot for the voltage current
and sparks.
Entry  Wednesday, June 20, 2012, 11:39, Grant Minor, South Hot-Cell, Development, TM3, N/A, TM3 Planned Activites at South Hot Cell Jun 20 to 29 2012 