Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 63 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subjectdown
  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300

Ta#68 spent target was moved in Pail 300 to storage vault location 5A. The dose rate measured at the South Hot Cell was 429 mSv/h at 1m. The target index spreadsheet has been updated and the current vault configuration is attached to this e-log. At this time, the storage vault is getting quite full - it is planned to remove five pails in January 2025.

Attachment 1: Storage_Vault_Contents_2024-12-05.pdf
Storage_Vault_Contents_2024-12-05.pdf
  13   Monday, July 25, 2011, 14:49 Travis CaveSpent Target VaultStandard Operation Ta#35Spent target move

Ta#35, in pail #88, has been place into spent target storage, in spot 6C. Upon removal from the South Hot Cell it was 411mSv/hr our hottest target to be placed into storage to date. There are 8 free slots for targets left in the vault.

  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target move

Ta#37 has been moved from the south hot cell into the storage vault. The target is in pail #89 and in spot 6A in the vault. It was 840uSv/hr upon removal from the south hot cell. There are 7 free spots left in the vault.

  31   Thursday, September 29, 2011, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#36Spent target move

The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south hot cell. There are 6 free slots left in the storage vault.

  36   Wednesday, October 05, 2011, 09:41 Travis CaveSpent Target VaultStandard Operation UCx#2Spent target move

The spent UCx #2 target has been moved into storage. It was placed in tray 5A and is in Pail #91, it was 8.91mSv/hr upon removal from the south hot cell. There are 5 free slots left in the storage vault.

  54   Thursday, November 17, 2011, 11:51 Travis CaveSpent Target VaultStandard Operation TaC#1Spent target move

TaC#1 was moved from the south hot cell to the storage vault. It was placed in pail#92 and put in vault slot 7B. It was 239mSv/hr upon removal from the south hot cell.

  103   Wednesday, May 16, 2012, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#26Spent target move

SiC #26 was moved from the south hot cell into storage today. The target was is in pail # 94 and was placed in slot 1B in the storage vault. The fields of the pail at the hot cell were 118mSv/hr upon pail been removed from the hot cell. Attached is the current status of the storage vault.

Attachment 1: Vault_Storage_May_16_2012.pdf
Vault_Storage_May_16_2012.pdf Vault_Storage_May_16_2012.pdf Vault_Storage_May_16_2012.pdf Vault_Storage_May_16_2012.pdf
  124   Monday, June 11, 2012, 10:52 Travis CaveSpent Target VaultStandard Operation Nb#6Spent target move

The Nb#6 target has been moved from the south hot cell into storage. It was place in pail #95 and is in slot 5C of the vault. See attached file for more details.

Attachment 1: Vault_Storage_June_11_2012.pdf
Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf Vault_Storage_June_11_2012.pdf
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target move

SiC#27 has been moved from the south hot cell to the spent target vault. Target was placed in pail #96, placed in slot 3A, the fields at the hot cell were 178mSv/hr. For the latest on the vault see attached document.

Attachment 1: Vault_Storage_July_6_2012.pdf
Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf Vault_Storage_July_6_2012.pdf
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target move

Ta#38 was moved from the south Hot Cell to the Spent Target Vault. Target is in pail #97, and was placed into tray 6 slot B of the vault. Field around the pail upon removal from the Hot Cell were 226mSv/hr at about 1/2 metre. See attached PDF for vault details.

Attachment 1: Vault_Storage_August_2_2012.pdf
Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf Vault_Storage_August_2_2012.pdf
  173   Friday, September 07, 2012, 09:47 Travis CaveSpent Target VaultStandard Operation UO#3Spent target move

The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon removal from the hot cell were 42mSv/hr. See attached PDF for vault details.

Attachment 1: Vault_Storage_September_6_2012.pdf
Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf Vault_Storage_September_6_2012.pdf
  179   Friday, September 14, 2012, 10:45 Travis CaveSpent Target VaultStandard Operation UCx#4Spent target move

UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details.

Attachment 1: Vault_Storage_September_14_2012.pdf
Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf Vault_Storage_September_14_2012.pdf
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target move

The NiO #1 spent target was placed into storage today. It is in pail number 01 (101 on Vault Status page) and located in slot 4A of the vault. It was 35.5 mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Attachment 1: Vault_Storage_October_24_2012.pdf
Vault_Storage_October_24_2012.pdf Vault_Storage_October_24_2012.pdf Vault_Storage_October_24_2012.pdf Vault_Storage_October_24_2012.pdf
  212   Friday, November 09, 2012, 14:35 Travis CaveSpent Target VaultStandard Operation Nb#7Spent target move

Nb#7 was moved from the south hot cell to the target storage vault. The target was placed in pail #103 in slot 6A of the vault and had a reading of 178 mSv/hr upon removal from the south hot cell. See attached PDF for full vault details.

Attachment 1: Vault_Storage_November_9_2012.pdf
Vault_Storage_November_9_2012.pdf Vault_Storage_November_9_2012.pdf Vault_Storage_November_9_2012.pdf Vault_Storage_November_9_2012.pdf
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target move

On Nov 20th the 5 targets in mini storage have been moved to the F-308s, those F-308s have since been moved to the hot cell ante room. They will sit there until Monday.

  224   Thursday, December 06, 2012, 08:57 Travis CaveSpent Target VaultStandard Operation UCx#5Spent target move

UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction from the south hot cell. See attached PDF for vault details.

Attachment 1: Vault_Storage_December_6_2012.pdf
Vault_Storage_December_6_2012.pdf Vault_Storage_December_6_2012.pdf Vault_Storage_December_6_2012.pdf Vault_Storage_December_6_2012.pdf
  232   Tuesday, January 15, 2013, 14:37 Travis CaveSpent Target VaultStandard Operation TiC#3Spent target move

TiC #3 was moved from the south hot cell in to the vault storage today, it was placed in slot 4B and was in pail #104, it had a reading of 98.7mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Attachment 1: Vault_Storage_January_15_2013.pdf
Vault_Storage_January_15_2013.pdf Vault_Storage_January_15_2013.pdf Vault_Storage_January_15_2013.pdf Vault_Storage_January_15_2013.pdf
  373   Friday, May 31, 2013, 11:19 Travis CaveSpent Target VaultStandard Operation SiC#28 (RFQ Target)Spent target move

Spent target SiC#28 (RFQ Target) has been moved from the south hot to the storage vault. The target was placed in pail #105 in spot 2C of  the spent target vault. The target had a field of 24.8mSv/hr at about a meter upon removal from the south hot cell. See attached PDF for the status of the vault. It currently only has six free spots left.

Attachment 1: Vault_Storage_May_31_2013.pdf
Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf
  413   Monday, July 29, 2013, 14:32 Travis CaveSpent Target VaultStandard Operation Ta#40Spent target move

Spent target Ta#40 has been placed into storage. The target was placed in pail #107 and was put into slot 5A of the vault. It had a field of 224mSv/hr upon removal from the south hot cell. See attached PDF for more details.

Attachment 1: Vault_Storage_July_29_2013.pdf
Vault_Storage_July_29_2013.pdf Vault_Storage_July_29_2013.pdf Vault_Storage_July_29_2013.pdf Vault_Storage_July_29_2013.pdf
  416   Wednesday, July 31, 2013, 11:13 Travis CaveSpent Target VaultStandard Operation  Spent target move

Five spent targets have been removed from the storage vault and placed into the mini storage. The target placed into the mini storage are UO#3, UC#'s  3,4,5 and SIC#23. See attached PDFs for vault details.

Attachment 1: Vault_Storage_July_31_2013.pdf
Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf
Attachment 2: Mini_Vault_Storage_July_31_2013.pdf
Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf
ELOG V2.9.2-2455