Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1680     Entry time: Wednesday, January 17, 2018, 13:54
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Start TM3 turbo pumps at TCS.  

TM3 turbo-pumps are started at TCS. We will keep pumps running until next Wednesday.

ELOG V2.9.2-2455