  768   Monday, October 20, 2014, 08:59 David WangConditioning StationDevelopmentTM3 Started TCS water system.I started TCS water system this morning
to check if the chillers work properly.
  
  1038   Friday, August 14, 2015, 10:00 David WangConditioning StationRepairTM2 Started CS water package for TM2 I finished the rest TM2 connections to
CS, and started CS cooling package. Everything
works fine so far.
  
  409   Wednesday, July 24, 2013, 17:46 David WangConditioning StationStandard OperationTM4Sic 29#Started 3 turbo pumps on CS for TM43 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher
  
  449   Wednesday, September 11, 2013, 13:43 David WangConditioning StationDevelopmentTM3 Started 3 turbo pumps on CS for TM3TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far.
  
  2045   Thursday, January 09, 2020, 14:14 David WangConditioning StationStandard OperationTM3 Start of TCS roughing pump for TM3.I started TCS roughing pump. TM3 TP1 and
TP2 will be started tomorrow morning. 
  
  2072   Thursday, February 27, 2020, 10:37 David WangSafe Module ParkingStandard OperationTM2 Start of SMP vacuum pump.TM2 in SMP with old SiC #39 target on it.
SMP vacuum pump is started. 
  
  2092   Wednesday, May 20, 2020, 13:08 David WangCoolingStandard Operation  Start of HALCW sysytemHigh  active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and
  
  1680   Wednesday, January 17, 2018, 13:54 David WangConditioning StationStandard OperationTM3 Start TM3 turbo pumps at TCS. TM3 turbo-pumps are started at TCS. We
will keep pumps running until next Wednesday.
  
  1671   Tuesday, January 02, 2018, 10:46 David WangITE/ITW CoolingStandard Operation  Start High active water system.High active water system  was 
checked before restart. A small water leak
on resin can supply valve was found. It is
  
  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tensionIt was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present.
 PXL_20211119_190640081.jpg 
  2638   Wednesday, July 10, 2024, 10:44 Riley SykesSouth Hot-CellMaintenance  Spring idler install New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions
 Image.jfifImage_(2).jfif 
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target HallTargets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The
 Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf 
  69   Thursday, January 12, 2012, 08:43 Travis CaveSpent Target VaultStandard Operation  Spent targets to F-308sAll targets in the mini storage have been
moved to F-308s and those flasks have been
moved over to rad waste. The transfer of
  
  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault. The following targets have been moved
from the spent target vault to the mini vault:
#127 - SiC#31 (front)
  
  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February.
  
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storageThe following targets have been moved to
the mini storage from the target storage
vault:
  
  811   Thursday, December 04, 2014, 09:57 Travis CaveSpent Target VaultStandard Operation  Spent target placed in F-308.Spent targets in the mini storage were
placed into the F-308s yesterday, all F-308
have been removed from the the target hall
  
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target movedUC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a
 Vault_Storage_July_2_2015.pdf 
  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target movedSiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed
 Vault_Storage_July_30_2015.pdf 
  1114   Friday, October 23, 2015, 11:40 Travis CaveSpent Target VaultStandard Operation ZrC #7Spent target movedThe spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then
 Vault_Storage_October_23_2015.pdf 