Friday, April 13, 2012, 12:31, David Wang, Conditioning Station, Development, TM1, , TM1 and conditioning station leak check.
Wednesday, April 05, 2017, 14:13, David Wang, Conditioning Station, Maintenance, TM1, , TM1 and TCS vacuum system are connected together
Friday, April 01, 2016, 14:41, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and TCS vacuum system has been connected. TCS control page white out.
Thursday, March 24, 2016, 13:15, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and TCS vacuum system has been connected
Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started.
Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
Thursday, July 17, 2014, 11:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
Thursday, March 06, 2014, 14:12, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 air to vacuum and water lines leak check at CS.
8x
Thursday, September 10, 2015, 08:55, chad fisher, South Hot-Cell, Repair, TM1, , TM1 Window Leak Diag.
Tuesday, September 15, 2015, 11:06, chad fisher, South Hot-Cell, Repair, TM1, , TM1 Window Gasket Replacement
Thursday, August 02, 2012, 07:48, David Wang, Conditioning Station, Standard Operation, TM1, UCx, TM1 UCx target heat shield helium pressure check is done.
Thursday, November 08, 2012, 08:42, David Wang, Conditioning Station, Standard Operation, TM1, TiC #3, TM1 TiC #3 target heat shield helium pressure check is done.
Thursday, September 20, 2012, 09:16, David Wang, Conditioning Station, Standard Operation, TM1, Nb#7, TM1 Nb#7 target heat shield helium pressure check is done.
Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS
7x
Thursday, July 21, 2011, 17:39, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs
Friday, July 22, 2011, 10:30, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs
Wednesday, July 23, 2014, 13:36, David Wang, ITW, Standard Operation, TM1, , TM1 in ITW.
Wednesday, September 28, 2011, 11:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, TM#4 moved from South Hot Cell to to North East Silo.
Tuesday, May 25, 2021, 16:20, Anders Mjos, Conditioning Station, Maintenance, , , TK2 refilled
Monday, December 15, 2014, 08:50, Anders Mjos, Conditioning Station, Maintenance, TM2, , TK2 level below 15 in (secondary loop)