Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
709
Entry time:
Thursday, July 17, 2014, 11:49
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM1
Target/Number:
Subject:
TM1 and CS turbo pumps have been started
I connected TM1 at CS. All turbo pumps have been started. The pumping down is good so far.
ELOG V2.9.2-2455