Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
680
Entry time:
Tuesday, June 10, 2014, 14:02
Author:
David Wang
Category:
ITW
Type:
Standard Operation
Module:
TM1
Target/Number:
UC9#
Subject:
TM1 and ITW turbo pumps have been started.
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.
ELOG V2.9.2-2455