Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 680     Entry time: Tuesday, June 10, 2014, 14:02
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UC9# 
Subject: TM1 and ITW turbo pumps have been started. 

TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.

ELOG V2.9.2-2455