  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  507   Thursday, October 17, 2013, 17:16 Grant MinorITERepair  Pre-Separator-area (ITE Harp 9) Blocks ReplacedThe pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation.
 8x 
  526   Thursday, October 24, 2013, 15:54 Grant MinorSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
  
  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITEFriedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  714   Thursday, July 24, 2014, 18:21 Grant MinorSouth Hot-CellRepairTM2No target / no source trayLeak check on TM2 ionizer tube cooling lines C and D - module sideTarget Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. 
 ITA6021_Rev_14_screencapture_cooling_lines_24July2014.jpgTM2_hot_cell_leak_check_tube_heater_C_D_24July2014_small2.jpgTM2_hot_cell_leak_check_no_source_tray_24july2014.JPG 
  823   Monday, December 15, 2014, 15:55 Grant MinorConditioning StationRepair  Access to ISAC TCS TK2 Expansion Tank - Fall ArrestHello all,

Access was required this morning to
 TK2_Expansion_Tank_Elevation_ISAC1_Exp_Hall_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_1_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_2_-_15Dec2014.JPGTK2_Expansion_Tank_-_Fall_Arrest_Config_3_-_15Dec2014.JPG 
  893   Tuesday, April 21, 2015, 13:01 Grant MinorITWDevelopmentTM2 TM2 MK4 Optics Tray - banana plug bore modification (on bench)The MK4 optics tray prepared for TM2 (as
per ITA6082) had an undersized bore for the
banana plug, making insertion of the plug
 ita6092_redlines_gminor_21apr2015.pdfTM2_Optics_Tray_Bore_Mod_21Apr2015_1.JPGTM2_Optics_Tray_Bore_Mod_21Apr2015_2.JPGTM2_Optics_Tray_Bore_Mod_21Apr2015_3.JPG 
  900   Monday, April 27, 2015, 17:09 Grant MinorITEDevelopmentTM2 TM2 - New Source Tray - Water Block Seal Groove Inspection ReportThe water blocks soldered to the TM2 cooling
lines (see Ref. Assy. ITA6144) were inspected.
See attached inspection reports and
 IMG_1859.JPGTM2_New_Source_Tray_Water_Block_Inspection_Results_24_April_2015.pdfTM2_water_block_inspect_24Apr2015.pdfTM2_New_Source_Tray_Water_Block_Inspection_Results_April_2015.xlsx 
  917   Tuesday, May 26, 2015, 11:49 Grant MinorAssembly/Bench TestRepairTM2 TM2 New Source Tray - Braze & Solder Report - 22 May 2015Hello,

For reference, I have attached a list
 6x 
  941   Wednesday, June 10, 2015, 16:49 Grant MinorAssembly/Bench TestRepairTM2 TM2 New Source Tray - *HOLD* on installation into Hot Cell until HV approvalDon Jackson brought to my attention some
potential HV minimum spark     gap issues
with the source tray cooling lines. 
 ITA6144_RevC_markup_10Jun2015.pdfTM2_cooling_lines_too_close_GE_HS_10June2015.jpgTM2_cooling_lines_too_close_Window_MSP_10June2015.jpg 
  1003   Monday, July 20, 2015, 17:11 Grant MinorSouth Hot-CellRepairTM2 TM2 New Source Tray - additional photos 20 July 2015A few additional higher-resolution photos
of the TM2 source tray with new spacer ITA6270,
and bent copper ground line clip.
 3-8ths_gap_check_15July2015.JPGTM2_New_Source_Tray_20July2015.JPGTM2_Spacer_ITA6270_and_copper_ground_clip_detail_20July2015.JPG 
  1005   Tuesday, July 21, 2015, 10:40 Grant MinorAssembly/Bench TestRepairTM2 TM2 - bench inspection photos from 6-June-2015   TM2_Source_Tray_Bench_Inspection_6-June-2015_04.JPGTM2_Source_Tray_Bench_Inspection_6-June-2015_13.JPGTM2_Source_Tray_Bench_Inspection_6-June-2015_11.JPG 
  1046   Tuesday, August 25, 2015, 13:54 Grant MinorSouth Hot-CellRepairTM2ZrC#7TM2 - Electrical / HV Short Repair and Current Status (ZrC target)Hello all, 

TM2's first performance in the Conditioning
 TM2_Loose_Wires_Touching_Febiad_Gas_Line_notes_21Aug2015.jpgTM2_Wire_Bundle_Clear_of_Febiad_Gas_Line_notes_25Aug2015.jpg 
  1060   Tuesday, September 01, 2015, 16:03 Grant MinorITWStandard OperationTM2ZrC #7Photos of TM2 Connection Procedure on Docushare 1Sept2015https://documents.triumf.ca/docushare/dsweb/View/Collection-15323   
  1459   Thursday, March 23, 2017, 11:22 Grant MinorCraneMaintenance  Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & HoistStrange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist
 Target_Hall_crane_main_hoist_problem_-_A_Mjos_-_22_Mar_2017.pdfUpdate_-_Target_Hall_20T_Hoist_Inspection_-_G_Minor_-_23_Mar_2017.pdfRe__Update__Target_Hall_20T_Hoist_Inspection_-_David_Wang_-_23_mar_2017.pdf 
  1482   Thursday, April 06, 2017, 15:11 Grant MinorCraneMaintenance  Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

  
  1503   Tuesday, April 25, 2017, 19:35 Grant MinorCraneRepair  ISAC Target Hall Crane - West Hoist Brake Rattle

Normal
0




false
false
false
  
  1558   Tuesday, June 13, 2017, 11:10 Grant MinorCraneMaintenance  ISAC THall Crane 100% / 125% Load Test Documentation - 2011The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North
 ISAC_TH_Crane_Load_Test_Norelco_Sept_30_2011.pdfIMG_8722.JPGIMG_8752.JPGIMG_8735.JPGIMG_8745.JPG 
  491   Saturday, October 05, 2013, 14:45 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2vacuum readingsIG1
8.0 e-7 T
  