505
|
Wednesday, October 16, 2013, 18:53 |
Grant Minor | ITE | Repair | | | ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replaced | The blocks above the pre-separator section
of the ISAC beam lines were removed today
in the Target Hall by Bevan Moss and Chad |
11x |
507
|
Thursday, October 17, 2013, 17:16 |
Grant Minor | ITE | Repair | | | Pre-Separator-area (ITE Harp 9) Blocks Replaced | The pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation. |
8x |
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
660
|
Wednesday, May 14, 2014, 19:01 |
Grant Minor | ITE | Maintenance | TM3 | | HV short inspection at ITE | Friedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE. |
|
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check | There were some problems this morning with
provision of FEBIAD gas to the the target
at ITE. It was suspected that the gas |
|
714
|
Thursday, July 24, 2014, 18:21 |
Grant Minor | South Hot-Cell | Repair | TM2 | No target / no source tray | Leak check on TM2 ionizer tube cooling lines C and D - module side | Target Ionizer tube cooling lines "C"
and "D" in Target Module 2 were
both leak checked at the Hot Cell. |
|
823
|
Monday, December 15, 2014, 15:55 |
Grant Minor | Conditioning Station | Repair | | | Access to ISAC TCS TK2 Expansion Tank - Fall Arrest | Hello all,
Access was required this morning to |
|
893
|
Tuesday, April 21, 2015, 13:01 |
Grant Minor | ITW | Development | TM2 | | TM2 MK4 Optics Tray - banana plug bore modification (on bench) | The MK4 optics tray prepared for TM2 (as
per ITA6082) had an undersized bore for the
banana plug, making insertion of the plug |
|
900
|
Monday, April 27, 2015, 17:09 |
Grant Minor | ITE | Development | TM2 | | TM2 - New Source Tray - Water Block Seal Groove Inspection Report | The water blocks soldered to the TM2 cooling
lines (see Ref. Assy. ITA6144) were inspected.
See attached inspection reports and |
|
917
|
Tuesday, May 26, 2015, 11:49 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 New Source Tray - Braze & Solder Report - 22 May 2015 | Hello,
For reference, I have attached a list |
6x |
941
|
Wednesday, June 10, 2015, 16:49 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 New Source Tray - *HOLD* on installation into Hot Cell until HV approval | Don Jackson brought to my attention some
potential HV minimum spark gap issues
with the source tray cooling lines. |
|
1003
|
Monday, July 20, 2015, 17:11 |
Grant Minor | South Hot-Cell | Repair | TM2 | | TM2 New Source Tray - additional photos 20 July 2015 | A few additional higher-resolution photos
of the TM2 source tray with new spacer ITA6270,
and bent copper ground line clip. |
|
1005
|
Tuesday, July 21, 2015, 10:40 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 - bench inspection photos from 6-June-2015 | |
|
1046
|
Tuesday, August 25, 2015, 13:54 |
Grant Minor | South Hot-Cell | Repair | TM2 | ZrC#7 | TM2 - Electrical / HV Short Repair and Current Status (ZrC target) | Hello all,
TM2's first performance in the Conditioning |
|
1060
|
Tuesday, September 01, 2015, 16:03 |
Grant Minor | ITW | Standard Operation | TM2 | ZrC #7 | Photos of TM2 Connection Procedure on Docushare 1Sept2015 | https://documents.triumf.ca/docushare/dsweb/View/Collection-15323 |
|
1459
|
Thursday, March 23, 2017, 11:22 |
Grant Minor | Crane | Maintenance | | | Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist | Strange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist |
|
1482
|
Thursday, April 06, 2017, 15:11 |
Grant Minor | Crane | Maintenance | | | Target Hall Crane 20 ton hoist - Report by Gordon Crane 5-Apr-2017 |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
1503
|
Tuesday, April 25, 2017, 19:35 |
Grant Minor | Crane | Repair | | | ISAC Target Hall Crane - West Hoist Brake Rattle |
Normal
0
false
false
false
|
|
1558
|
Tuesday, June 13, 2017, 11:10 |
Grant Minor | Crane | Maintenance | | | ISAC THall Crane 100% / 125% Load Test Documentation - 2011 | The ISAC Target Hall Crane was load tested
and re-certified in January 2011 prior to
doing a near-capacity lift for the North |
|
491
|
Saturday, October 05, 2013, 14:45 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | vacuum readings | IG1
8.0 e-7 T |
|