2035
|
Friday, November 29, 2019, 13:10 |
David Wang | ITE | Standard Operation | TM2 | SiC 39# febiad | TM2 SiC#39 connection check list. | TM2 has been connected in ITE.
All turbo-pumps are started. |
|
2030
|
Tuesday, November 19, 2019, 13:41 |
David Wang | ITE | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC#38 connection check list. | TM2 was connected in ITE 12th Nov. attach
checklist |
|
2032
|
Wednesday, November 27, 2019, 13:46 |
David Wang | Conditioning Station | Standard Operation | TM2 | SiC 38# febiad | TM2 SiC #38 disconnection checklist. | TM2 was disconnected in ITE yesterday. |
|
2472
|
Tuesday, August 08, 2023, 12:59 |
David Wang | ITW | Standard Operation | TM2 | SiC #6 | TM2 SiC#6 dhas been disconnected in ITW | TM2 SiC#6 has been disconnected in ITW.
See check list |
|
2621
|
Wednesday, June 19, 2024, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 electrical check with SiC#46 target at SHC | Tm3 electrical check with SiC#46 target
and HS line helium spray check at SHC. were
done. everything is good. see attachment. |
|
2623
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2624
|
Tuesday, June 25, 2024, 11:59 |
David Wang | ITE | Standard Operation | TM3 | SiC #46 | Tm3 has been moved from TCS to ITE. | Tm3 has been moved from TCS to ITE. the
move is smooth. |
|
2647
|
Thursday, August 08, 2024, 11:41 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning. | Tm3 was moved from ITE to TCS this Tuesday,
then to SHC this morning. Both moves
are successful. |
|
2648
|
Thursday, August 08, 2024, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | TM3 SiC#46 electrical check at SHC with target on (After operation) | ABCD is short to 60KV bias. Othjer are
ok. see attachment.
Found afterwards that this short |
|
2356
|
Thursday, August 11, 2022, 09:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #44 | HS line helium pressure test. Gas line fitting on module top and gas line leak check. | HS line helium pressure test is done at
TCS. No leak. I also leak checked gasline
adapter and fittings on TM4 top. No leak. |
|
2077
|
Thursday, March 05, 2020, 07:16 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC #39 | TM2 SiC #39 post run electrical checklist | Electrical check result is fine.
See attachment. |
|
2078
|
Friday, March 06, 2020, 09:35 |
David Wang | Spent Target Vault | Standard Operation | | SiC #39 | Spent target SiC#39 removal from SHC to storage vault. | Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful. Note:The small aluminum |
|
927
|
Tuesday, June 02, 2015, 14:32 |
David Wang | South Hot-Cell | Standard Operation | TM4 | SiC #31 | Leak check on TM4 HS water line with new SiC #31 target. at SHC | Chad and I leak checked TM4 HS water line
with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec.
No leak. The line will be helium pressurized |
![003.JPG 003.JPG](attachment.png) ![005.JPG 005.JPG](attachment.png) |
929
|
Tuesday, June 02, 2015, 14:39 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #31 | TM4 and CS turbo- pumps are started . | TM4 and CS turbo-pumps are started this
afternoon. Everything is good so far. |
|
932
|
Wednesday, June 03, 2015, 13:51 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #31 | TM4 is connected at CS | TM4 has been connected at CS. CS HV cover
is installed.I made a pair of new cooling
lines for TM window cooling at CS. The TM4 |
![007.JPG 007.JPG](attachment.png) ![009.JPG 009.JPG](attachment.png) ![008.JPG 008.JPG](attachment.png) |
939
|
Wednesday, June 10, 2015, 11:49 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. At this
stage, water is supplied to TM4 only. We
checked the TM4 water signals from electrical |
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check | There were some problems this morning with
provision of FEBIAD gas to the the target
at ITE. It was suspected that the gas |
|
411
|
Thursday, July 25, 2013, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #29 | TM4 HS helium pressure test andTM4 connection at CS | Bevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec |
|
2107
|
Thursday, June 18, 2020, 13:25 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | Disconnect TM4 in ITE. | TM4 has been disconnected in ITE. Vacuum
pumps and gauge are not disconnected yet.
|
|