HP febiad target SiC#26 was installed onto Tm4 on Monday morning.
"JP's" connector required lossing of the two mounting fasteners. Connector was pushed tight to its mating half on the source tray and both fasteners retightened, and the mating checked; it was good.
Two new 7/8 long 3/8-16 fasteners were used for the febiad coil connections.
Installation went well.
Leak check was performed:
Base Pressure: 0.0x10-4
Stable leak rate 0.0x10-9
Left vcr joint was checked two times with a 2 second spray of helium with a 60 second waiting time between sprays; no response.
Right vcr joint was checked two times with a 2 second spray of helium with a 60 second waiting time between sprays; no response.
Fllod of system with a 6 second spray; no response. |