535
|
Tuesday, November 05, 2013, 10:37 |
chad fisher | South Hot-Cell | Repair | TM2 | | Thermocouple wire removal | The old thermocouple wire has been sucessfully
removed from the module.
Thanks Bevan, Travis and David. |
|
536
|
Wednesday, November 06, 2013, 10:41 |
David Wang | South Hot-Cell | Repair | TM2 | | Installed 2 turbopumps on TM2 | Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation. |
|
538
|
Tuesday, November 12, 2013, 10:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM2 | | Electrical Test | Don Jackson and Myself completed
started an electrical test on TM2. All lines
passed the with OL to ground. When testing |
|
539
|
Tuesday, November 12, 2013, 12:43 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | TM2 moved from SHC to TCS | TM2 was moved by myself and David
from the SHC to the TCS. Move went well.
Curiously the fields on the module were measured |
|
540
|
Tuesday, November 12, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | Turbo pumps started | The turbo pumps have been started
on TM2 and the conditioning station. |
|
542
|
Wednesday, November 13, 2013, 10:01 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 leak check at conditioning station | I leak checked TM2 at conditioning station
this morning. All air to vacuum seals on
the top of the module are good. All water |
|
543
|
Thursday, November 14, 2013, 08:08 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Blank off and jig removal | Firday, November 8 all water blocks (excluding
I and K) were blanked off and vacuum leak
checked. No responses were found. (First |
|
544
|
Friday, November 15, 2013, 16:48 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Testing | High voltage testing was started
on TM2 with no source tray today. The maximum
stable for 1 minute voltage reached was 47.5kV |
|
545
|
Monday, November 18, 2013, 11:54 |
Bevan Moss | Conditioning Station | Repair | TM2 | | Fault on TCS Chill | This morning when I went to start
HV conditioning CP2 and CP3 both had faults
and the temperature of the water was ~27C. |
|
546
|
Monday, November 18, 2013, 16:42 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Testing | The Glory of TM2 continues 100V at
a time. Today I brought the module to 46kV
and left it there for 1 hour. During this |
|
550
|
Tuesday, November 19, 2013, 16:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV conditioning | HV conditioning of TM2 continued
today. At ~53.5kV the module started to spark
externally to the HV cover. This is the first |
|
553
|
Wednesday, November 20, 2013, 13:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV testing of TM2 | HV testing without the cover continued
today. With the EINZEL lens at 30kV the target
module was able to achieve 58.7kV. At this |
|
565
|
Tuesday, December 03, 2013, 14:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV conditioning | It was attempted to HV condition
TM2 to 55kV and leave it operating there
for an hour to demonstrate stability. Unfortunately |
|
575
|
Friday, December 06, 2013, 15:09 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | TM2 no source tray 55kV 1 hour | Today 55kV was applied to TM2 and held
for over 1 hour with the EINZEL at 27.5kV.
There were 2 sparks and the current was unstable |
|
578
|
Thursday, December 12, 2013, 11:14 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | HV Chase Electrical Test | While under vacuum Travis and I completed
diagnostics of the HV chase. Majority of
the lines showed OL at 1kV but there were |
|
589
|
Thursday, January 30, 2014, 13:46 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
591
|
Tuesday, February 04, 2014, 08:04 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line. | Chad and I leak checked TM2 tube heater(+)
water line yesterday afternoon. The water
line was difficult to pump down on base leak |
|
592
|
Tuesday, February 04, 2014, 09:42 |
David Wang | South Hot-Cell | Repair | TM2 | | pressure test on TM2 tube heater +(D) water line. | Chad and I did a pressure test on TM2 tube
Heater+(D) water line.I pressurized the D
line with shop air from quick connectors(both |
10x |
593
|
Wednesday, February 05, 2014, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | Leak check TM2 tube heater (+) water line from inside service cap in TH. | Bevan and I did a leak check on TM2 tube
heater+ from inside service cap in TH. The
leak detector base leak rate 0.0xE-9 atm.cc/sec, |
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D | Containment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and |
|