Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2747     Entry time: Monday, January 13, 2025, 10:36
Author: Frank Song 
Category: ITE 
Type: Standard Operation 
Module: TM3 
Target/Number: UCx#47 
Subject: module disconnection 

 TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC.

Attachment 1: TM3_with_spent_target_UCx#47_disconnection_in_ITE_2025-01-13.pdf  137 kB  | Show | Hide all
ELOG V2.9.2-2455