|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
|
2444
|
Wednesday, May 24, 2023, 08:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | TiC#6 | TM2 HS line helium pressure check and gasline fittins leak check. | TM2 HS line helium leak check is done.
leak detector base LR 1.8xE-8atm.cc/sec.
helium pressure 70 psi. 5 minutes test. no |
|
|
2327
|
Monday, June 06, 2022, 14:15 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | SiC#42 | TM2 FEBIAD with Target and No external Connections | An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. |
|
|
2315
|
Thursday, April 21, 2022, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Febiad TEST | TM2 FEBIAD WITH A TEST TARGET | A Test Febiad Target was installed
and checked at SHC. |
|
|
534
|
Monday, November 04, 2013, 10:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Exploration | TM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks. |
|
|
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
|
997
|
Wednesday, July 15, 2015, 11:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Line Vacuum Leak Check | TM2 coil line R,U has been vacuum leaked
check at the hot cell and has passed with
no response from the leak detector. |
|
|
979
|
Friday, July 03, 2015, 11:33 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Leak Progress | First thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification |
|
|
2115
|
Friday, July 03, 2020, 06:57 |
David Wang | ITW | Standard Operation | TM2 | C#1 | TM2 CONNECTION CHECKLIST | SEE ATTACHMENTS. EVERYTHING IS GOOD. |
|
|
595
|
Friday, February 07, 2014, 10:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 C.B. and circuit D | Containment box has been removed and the
blank off from circuit D has been removed
for inspection of both the blank off and |
|
|
543
|
Thursday, November 14, 2013, 08:08 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Blank off and jig removal | Firday, November 8 all water blocks (excluding
I and K) were blanked off and vacuum leak
checked. No responses were found. (First |
|
|
1005
|
Tuesday, July 21, 2015, 10:40 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 - bench inspection photos from 6-June-2015 | |
|
|
900
|
Monday, April 27, 2015, 17:09 |
Grant Minor | ITE | Development | TM2 | | TM2 - New Source Tray - Water Block Seal Groove Inspection Report | The water blocks soldered to the TM2 cooling
lines (see Ref. Assy. ITA6144) were inspected.
See attached inspection reports and |
|
|
1046
|
Tuesday, August 25, 2015, 13:54 |
Grant Minor | South Hot-Cell | Repair | TM2 | ZrC#7 | TM2 - Electrical / HV Short Repair and Current Status (ZrC target) | Hello all,
TM2's first performance in the Conditioning |
|
|
1232
|
Friday, May 13, 2016, 10:12 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 water lines, heaters, EE, and EL are connected at TCS. | The HV cover is installed on to TM2
after the connections. The HV key is returned
back to B2 level. The TCS Faraday cage is |
|
|
1171
|
Friday, March 18, 2016, 09:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 vacuum sysytem has been connected at TCS | TM2 vacuum system has been connected at
TCS. Started roughing pump. Everything is
good so far. |
|
|
1098
|
Wednesday, October 14, 2015, 12:42 |
David Wang | ITW | Standard Operation | TM2 | ZrC#7 | TM2 has been disconnected in ITW | Dan and I disconnected TM2 in ITW this
morning. |
|
|
1158
|
Thursday, February 25, 2016, 09:27 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW | TM2 has been disconnected in ITW (except
vacuum lines). The vacuum system is still
operating. |
|
|
1176
|
Monday, March 21, 2016, 15:27 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 has been disconnected at TCS | TM2 vacuum system has been disconnected
at TCS. Venting is in process now. |
|
|
1246
|
Wednesday, May 25, 2016, 14:08 |
David Wang | ITW | Standard Operation | TM2 | Ta#48 | TM2 has been connected in ITW | TM2 has been connected in ITW by Dan.M
and David.W. All turbo-pumps have been started.
Everything is good so fine. |
|