Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2315
Entry time:
Thursday, April 21, 2022, 13:29
Author:
Frank Song
Category:
South Hot-Cell
Type:
Standard Operation
Module:
TM2
Target/Number:
Febiad TEST
Subject:
TM2 FEBIAD WITH A TEST TARGET
A Test Febiad Target was installed and checked at SHC.
Attachment 1:
TEST_FEBIAD_TARGET_E_CHECK.jpg
647 kB
|
Show
|
Hide all
ELOG V2.9.2-2455