2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection | TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with. |
|
|
2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. | TM3 has been moved from ITW to S-W silo.
The move is smooth. |
|
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal | TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under |
13x |
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. | Tm3 has been moved from silo to SHC.
The move is smooth. |
|
|
2687
|
Monday, September 23, 2024, 11:26 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | TM3 window line has been leak checked. | TM3 window line has been leak checked after
containment box removal and installation
for insulator installation on water cup C. |
|
|
2688
|
Monday, September 23, 2024, 11:31 |
David Wang | South Hot-Cell | Development | TM3 | | 10 pins lectrical check result after insulator is installed on water cap C. | 10 pins lectrical check result after insulator
is installed on water cap C.
pin 14 to 60kv bias has 20 Kohm @250V |
|
|
2690
|
Monday, September 23, 2024, 16:06 |
Aaron Tam | South Hot-Cell | Repair | TM3 | | Insulator Addition to Water block | September 23, 2024 - C. Fisher
Containment box removed
Insulator installed
New |
|
|
2693
|
Wednesday, September 25, 2024, 09:12 |
David Wang | South Hot-Cell | Maintenance | TM3 | | Tm3 has been moved from SHC to silo. | Tm3 has been moved from SHC to silo.
the move is smooth. |
|
|
2720
|
Monday, November 25, 2024, 09:56 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 move - silo to SHC | TM3 was moved from silo to SHC with no
target. Move successful. |
|
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check | An electrical check and leak check had
been done after new target UCx47 was installed
on TM3 in SHC. see attachment pls. |
|
|
2722
|
Tuesday, November 26, 2024, 13:54 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 move - SHC to TCS | TM3 was moved from SHC to TCS with UCx#47.
The move was smooth. |
|
|
2723
|
Tuesday, November 26, 2024, 14:52 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | UCx#47 | UC#47 LP-SIS w/ gas Install | November 26, 2024 - Aaron Tam
Handover from TPO and inspection
Completed
Some |
6x |
|
2729
|
Wednesday, December 04, 2024, 08:05 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | Module Connection | TM3 with new target UCx#47 was connected
in ITE right after be moved from TCS. |
|
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer | 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving. |
|
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down | ITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak. The TM3 waterlines helium |
|
|
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection | TM3 with spent target UCx#47 was
disconnected in ITE and will be moved to
SHC. |
|
|
2748
|
Tuesday, January 14, 2025, 10:00 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#47 | after operation electrical check, Tm3 UCx 47 | TM3 UCx#47 after operation electrical check
is done at SHC. The result is normal. See
attachment. |
|
|
2750
|
Thursday, January 16, 2025, 14:21 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM3 electrical check at TCS under good vacuum | A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV |
|
|
533
|
Friday, November 01, 2013, 09:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the north west
silo to the south hot cell. The module has
a field of about 3.1mSv/hr when it was lowered |
|
|
534
|
Monday, November 04, 2013, 10:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Exploration | TM2 is now in the hot cell with the containment
box off for inspection and eventual blank
off off the water blocks. |
|