Entry  Friday, June 26, 2015, 09:44, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Retrofit Status 20150625_075616_1.jpg20150625_083457.jpg20150625_105735.jpg20150625_110053.jpg
On June 25th the following work was completed:
Optics tray was installed into TM2. The lower fastener on the vertical cable tray (IRH1585) needed to be removed and vertical cable tray rotated
upwards as optics tray would not clear cable tray. Optics tray was intstaled, cable tray repositioned and screw re-inserted.
Entry  Tuesday, December 02, 2014, 10:15, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Reburb. Loop Install TM2_20141202_01.jpg20141203_142215.jpg20141203_143530.jpg
Final polish, clean with methanol and clean compressed air.
Loop installed and torqued to 90 in lbs.
Minimum of approximately 1"  between loop and containment box at closest point.
Entry  Monday, December 01, 2014, 14:06, chad fisher, South Hot-Cell, Repair, TM2, , TM2 REFURB. WATER LOOP TEST TM2_20141201_01.JPGTM2_20141201_02.JPGTM2_20141201_03.JPGTM2_20141201_04.JPGTM2_20141201_05AC.jpg
Some issues with the turntable and having to wait for a decision on whether to remove TM2 from the hot cell so that TM4 with dead UCx target could be
put in this morning.
Progress on TM2:
Entry  Thursday, June 18, 2015, 08:03, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Optics Tray Transfer 20150618_075326_1.jpg
The TM2 optics tray has been transferred from the source tray to the transfer fixture in preparation for installation of the source tray into the module.
Entry  Tuesday, March 31, 2015, 11:36, chad fisher, South Hot-Cell, Development, TM2, , TM2 Optics Tray Complete 20150331_OPTICS_FRONT.jpg20150331_OPTICS_MIDDLE.jpg20150331_OPTICS_BACK.jpg
TM2 optics tray is complete.
Master alignment tray: 0 up/down, 0 left/right
Optics tray: Front 0 up/down, 0 left/right. Middle 0 up/down, 0 left/right. Back 0 up/down, 0 left right.
Entry  Friday, March 20, 2015, 13:37, chad fisher, South Hot-Cell, Development, , , TM2 Optics Tray 20150320_113132[2].jpg20150320_113018_1[1].jpg
Final assembly and alignment of TM2 optics tray continued today. Front section is "aligned".
Entry  Monday, July 20, 2015, 17:11, Grant Minor, South Hot-Cell, Repair, TM2, , TM2 New Source Tray - additional photos 20 July 2015 3-8ths_gap_check_15July2015.JPGTM2_New_Source_Tray_20July2015.JPGTM2_Spacer_ITA6270_and_copper_ground_clip_detail_20July2015.JPG
A few additional higher-resolution photos of the TM2 source tray with new spacer ITA6270, and bent copper ground line clip.
Also attached is a photo of a 3/8" copper line placed in between the loose ECR line and the Mounting Support Plate line, for dimensional reference.
Entry  Tuesday, May 26, 2015, 11:49, Grant Minor, Assembly/Bench Test, Repair, TM2, , TM2 New Source Tray - Braze & Solder Report - 22 May 2015 6x
Hello,

For reference, I have attached a list of all solder joints in the TM2  Source Tray, and the alloys used for the most recent build (as per  ITA6144).  
Entry  Wednesday, June 10, 2015, 16:49, Grant Minor, Assembly/Bench Test, Repair, TM2, , TM2 New Source Tray - *HOLD* on installation into Hot Cell until HV approval ITA6144_RevC_markup_10Jun2015.pdfTM2_cooling_lines_too_close_GE_HS_10June2015.jpgTM2_cooling_lines_too_close_Window_MSP_10June2015.jpg
Don Jackson brought to my attention some potential HV minimum spark     gap issues with the source tray cooling lines.  It appears:

- The gap between the Ground Electrode cooling lines (ground) and     Heat Shield cooling lines (HV) does not meet the spec of 0.668" MIN 
Entry  Wednesday, August 09, 2023, 09:41, David Wang, North Hot-Cell, Standard Operation, TM2, Nb#10, TM2 Nb# 10 electrical and leak check at NHC Nb_#10_electrical_and_leak_check_at_NHC.pdf
Nb#10 has been installed on TM2 . electrical and leak check on HS line are good. See attachment.
Entry  Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station 
TM2 was moved from ITW to the Conditioning Station. 
Entry  Tuesday, January 09, 2024, 16:10, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - SHC to Silo 
TM2 was moved with no target attached from the South Hot Cell to a silo. 
Entry  Monday, January 08, 2024, 14:47, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - ITW to SHC 
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. 
Entry  Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move 
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. 
Entry  Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move 
TM2 was moved from South Hot Cell to ITE. ZrC #8 target. 
Entry  Monday, October 07, 2019, 09:56, Adam Newsome, ITE, Standard Operation, TM2, Ta 59, TM2 Move 
TM2 has been moved from the Conditioning Station to ITE with Ta#59 target.
Entry  Tuesday, November 12, 2019, 10:02, Adam Newsome, ITE, Standard Operation, TM2, SiC#38, TM2 Move 
TM2 was moved from the Conditioning Station to ITE, with SiC#38 target. 
Entry  Tuesday, April 21, 2015, 13:01, Grant Minor, ITW, Development, TM2, , TM2 MK4 Optics Tray - banana plug bore modification (on bench) ita6092_redlines_gminor_21apr2015.pdfTM2_Optics_Tray_Bore_Mod_21Apr2015_1.JPGTM2_Optics_Tray_Bore_Mod_21Apr2015_2.JPGTM2_Optics_Tray_Bore_Mod_21Apr2015_3.JPG
The MK4 optics tray prepared for TM2 (as per ITA6082) had an undersized bore for the banana plug, making insertion of the plug extremely difficult /
impossible.
Reference stores parts were collected to check the fit:  male plug 3-4/01152 and female jack 1-6/1201.  The size of the female jack was
Entry  Monday, October 24, 2016, 12:22, chad fisher, South Hot-Cell, Repair, , , TM2 Insulator replacement 
conductor insulators itd0053 and 54 have been replaced on TM2. All fasteners (1/4-20 x 1 1/4 vented) torqued to 60 in lbs.
Entry  Wednesday, September 20, 2017, 13:38, chad fisher, South Hot-Cell, Repair, TM2, , TM2 Insulator replacement 20170920_132813.jpg20170920_132820.jpg20170920_133244.jpg
Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.