Subject: TM2 Retrofit Status 

On June 25th the following work was completed:

Optics tray was installed into TM2. The lower fastener on the vertical cable tray (IRH1585) needed to be removed and vertical cable tray rotated upwards as optics tray would not clear cable tray. Optics tray was intstaled, cable tray repositioned and screw re-inserted.

Modified water block for 9 pin connector was installed.

Steerers connected.

Ground Electrode water blocks were "repositioned" closer to there specified position to attempt eliminating the short between the ground electrode line and coil 1 circuit. This was successful but could still use a clamp or other method of ensuring the ground electrode line is in its "proper" place.

9 pin connector line was rerouted to ensure it does not contact anything it is not suppose to (Rerouting directions provided by Anders).

Enzel lens cable was installed.

Blank offs removed from window water lines and new gaskets installed in preparation for installation of the containment box.

 

Attachment 1: 20150625_075616_1.jpg  1.132 MB  Uploaded Friday, June 26, 2015, 10:49  | Show | Hide all
Attachment 2: 20150625_083457.jpg  1014 kB  Uploaded Friday, June 26, 2015, 10:50  | Show | Hide all
Attachment 3: 20150625_105735.jpg  1.064 MB  Uploaded Friday, June 26, 2015, 10:50  | Show | Hide all
Attachment 4: 20150625_110053.jpg  1.096 MB  Uploaded Friday, June 26, 2015, 10:51  | Show | Hide all