ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  358   Thursday, May 23, 2013, 11:14 David WangSouth Hot-CellStandard OperationTM4TA#40 TM4 TA# 40 HS leak check at SHCTM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be  a helium pressure test on it at
  
  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check  TM4 with Sic#44 installed and had
an electrical / leak check at NHC. 
 TM4_with_Sic#44_eletrical_and_leak_check.jpg 
  2370   Monday, October 03, 2022, 09:42 Frank SongITEStandard OperationTM4Sic#44module disconnection TM4 with SiC@44 was disconnected
in ITE.
 TM4_with_SiC#44_disconnected_in_ITE.png 
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment.
 TM2_with_SiC43.jpg 
  2245   Friday, September 17, 2021, 12:20 Frank SongNorth Hot-CellStandard OperationTM4Sic#41TM4 SIS with Target and No external Connections TM4 electric check with new target
was done by David. A pic attached here for
ref.
 IMG_3603.jpg 
  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well.
 IMG_3602.jpgIMG_3601.jpgIMG_3600.jpgIMG_3599.jpg 
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection TM4 was disconnected and moved to
NHC. 
 IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg 
  2322   Thursday, May 19, 2022, 11:42 Travis CaveSpent Target VaultStandard Operation Sic#39, Ta#59, C#2, UC# 32 & 30Targets moved to the mini vault. Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached
 Target_Index_2022-05-19.pdfMini_Vault_Target_Index_2022-05-19.pdf 
  280   Wednesday, March 27, 2013, 11:49 David WangITEStandard OperationTM4Sic LIS-RFQ Connected TM4 in ITETM4 has been reconnected to ITE after the
module moving. The roughing is started .
The water will be supplied to ITE after 
  
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  409   Wednesday, July 24, 2013, 17:46 David WangConditioning StationStandard OperationTM4Sic 29#Started 3 turbo pumps on CS for TM43 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher
  
  284   Wednesday, April 03, 2013, 12:26 David WangITEMaintenanceTM4Sic LIS/RFQLeak check on ITE TM4.TM 4 had been leak check in ITE due to
  relatively high PNG1 and IG1 readings.All
TM4 primary and secondary  vessel air
  
  2625   Tuesday, June 25, 2024, 12:49 Frank SongITEStandard OperationTM3SiC#46Module Connection TM3 with new target SiC#46 was connected
in ITE.
 TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf 
  2630   Thursday, July 04, 2024, 01:20 Carla BabcockITEDevelopmentTM3SiC#46TM3 conditioning with protonsInitial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without
  
  2646   Tuesday, August 06, 2024, 09:16 Frank SongITEStandard OperationTM3SiC#46module disconnection TM3 with spent target SiC#46 was
disconnected in ITE and ready to move to
TCS soon.
 TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf 
  2659   Wednesday, August 14, 2024, 11:29 Aaron TamWaste Package/ShipStandard Operation SiC#46Target Disposal and visual check  SiC#46 loaded into pail 293 successfully
along with other hotcell waste 
Upon visual inspection of the target,
 SiC46.jfif 
  2660   Friday, August 16, 2024, 08:47 Travis CaveSpent Target VaultStandard Operation SiC#46Spent Target Move SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed
 Target_Index_2024-08-16.pdf 
  2457   Tuesday, June 13, 2023, 11:49 Frank SongNorth Hot-CellStandard OperationTM4SiC#45electrical check and leak check TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC.
 TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png 
  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed.
 TM4_with_SiC#45_connected_in_ITE_20230613.pdf 
  2464   Tuesday, July 18, 2023, 10:08 Frank SongNorth Hot-CellStandard OperationTM4SiC#45module disconnection & electrical check right after transferred from ITE to NHC TM4 with spent target SiC#45 was
disconnected ITE  and an electrical
check made right after moved on NHC. 
 TM4_with_SiC45_disconnection_and_e_check.pdf 