ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1571   Wednesday, June 28, 2017, 10:00 David WangConditioning StationStandard OperationTM4Ta#52TM2 has been connected at TCSI started TCS water system.   
  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCSTCS vacuum system and water system have
been started as well. Everything looks fine.
  
  1343   Tuesday, August 30, 2016, 13:17 David WangITWStandard OperationTM2 TM2 has been connected at ITW  ITW turbo pumps  have been
started.
  
  1383   Tuesday, October 25, 2016, 15:10 David WangITWStandard OperationTM2 TM2 has been connected at ITWAll turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far.
  
  1059   Tuesday, September 01, 2015, 14:54 David WangITWStandard OperationTM2 TM2 has been connectec in ITW.TM2 has been connected in ITW. During the
connection, Anders and I  found the
TM2  high current cables used in ITE
  
  1168   Thursday, March 17, 2016, 14:57 David WangSouth Hot-CellRepairTM2 TM2 first round leak check in SHCChad and I finished the first round check
on Tm2 water lines.  The lines and spots
checked are: Target oven + and - (front side
  
  1968   Friday, August 16, 2019, 14:23 Carla BabcockITERepairTM2ZrC#8TM2 electrical checks in ITERamped voltage on TM2 up to 30kV with no
problems. Bias current is at 29uA, same as
original TM2 bias current (see archiver for
  
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target. An electric check was done right
after module moving from SMP to SHC. 
 TM2_without_UCx36_at_SHC_(2).jpg 
  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo TM2 with no target on SW silo be
electrical checked right after module moving.
 TM2_electrical_check_without_UCx40_on_SW_silo.png 
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections A standard electrical check was done
for TM2 after the short issue be fixed.
 TM2_with_UCx38_echeck_on_NHC.jpg 
  1425   Tuesday, January 24, 2017, 15:24 David WangConditioning StationStandard OperationTM2 TM2 electrical check and leack check.I did electrical check before and after
Fefiad target installation on TM2. The RU
(coil) Is till short to 60KV as before. Other
  
  2156   Monday, October 19, 2020, 12:52 David WangSouth Hot-CellStandard OperationTM2C#2TM2 electrical and leak check at SHCTM2 electrical check and leak check are
done at SHC with C#2 target installed. The
results are good.  
 Tm3_bunker_set_up_018.JPG 
  995   Tuesday, July 14, 2015, 12:56 chad fisherSouth Hot-CellRepairTM2 TM2 containment box removedContainment box was removed from Tm2 this
morning  in preparation for installation
of coil line and all the trimmings.
  
  1735   Monday, June 11, 2018, 11:30 chad fisherSouth Hot-CellRepairTM2 TM2 containment box onTm2 containment box has been re-installed
onto TM2.
  
  1625   Friday, September 22, 2017, 14:15 chad fisherSouth Hot-CellRepairTM2 TM2 containment box offTM2 containment box has been removed. Found
a piece of capton tape or tubing under table
(see picture).
 20170922_140546.jpg20170922_140927.jpg 
  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check. Chad installed containment box back to
TM2 yesterday. We leak checked VCR joints
on window line.    No leak.
  
  1876   Tuesday, February 26, 2019, 08:51 chad fisherSouth Hot-CellRepairTM2 TM2 containment boxThe containment box has been reinstalled
onto TM2 in prepatation for testing in the
conditioning station.
  
  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITWTM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST
  
  2771   Tuesday, February 18, 2025, 10:41 David WangConditioning StationStandard OperationTM3No targetTM2 at TCS annual electrical check and water lines helium pressure check .TM2
has been moved to TCS and under good vacuum.
TP1/2 work fine.  Electrical check:
 TM2_at_TCS_annual_electrical_chheck_and_leak_check.pdf 
  1037   Thursday, August 13, 2015, 17:17 David WangConditioning StationRepairTM2Dummy targetTM2 at CSTM2 has been moved to CS. All turbo-pumps
have been started. The pumping down is good
so far.  I connected the leak detector
  