2489
|
Thursday, September 14, 2023, 11:16 |
Adam Newsome | Spent Target Vault | Development | | Ta #58 | Investigation of Pail 211 (Ta #58) | Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the |
|
|
1799
|
Wednesday, October 03, 2018, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta #57 | Leak check TM4 Lp Ta# 57 at SHC. | Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all |
|
|
569
|
Wednesday, December 04, 2013, 13:57 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta #47 | Ta #47 Removed - broken bolt | Ta #47 has been removed from TM4.
One containment box cover bolt would
not come out. Upon attempted removal with |
|
|
635
|
Monday, March 31, 2014, 13:22 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #42 | HV conditioning | TM4 with Ta#42 was HV conditioned
to 35kV with the optics tray at 17.5kV. There
was some vacuum response while ramping but |
|
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
|
367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
|
288
|
Thursday, April 04, 2013, 12:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started | Roughing started at 12:06. It was
believed there was a problem with the compressed
air but there was none, TM1 doesn't leak |
|
|
289
|
Thursday, April 04, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Roughing started |
|
|
|
292
|
Monday, April 08, 2013, 16:16 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Ta #39 | Venting with Argon | TM1 started venting at 4:15 pm with
Argon. I will leave the valve open over night. |
|
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
|
661
|
Thursday, May 15, 2014, 14:38 |
David Wang | ITE | Repair | TM3 | TM3 | Bias short on ITE | Anders and I opened the HV cover in ITE
and did a visual check inside ITE HV
cover and top of TM3.Bill was with us and |
|
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check | TM4 with Sic#44 installed and had
an electrical / leak check at NHC. |
|
|
2370
|
Monday, October 03, 2022, 09:42 |
Frank Song | ITE | Standard Operation | TM4 | Sic#44 | module disconnection | TM4 with SiC@44 was disconnected
in ITE. |
|
|
2331
|
Monday, June 20, 2022, 18:03 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Sic#43 | electrical check | TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment. |
|
|
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
|
2246
|
Friday, September 17, 2021, 12:34 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | Module Connection | TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well. |
|
|
2254
|
Monday, October 04, 2021, 09:37 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | module disconnection | TM4 was disconnected and moved to
NHC. |
|
|
2322
|
Thursday, May 19, 2022, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Sic#39, Ta#59, C#2, UC# 32 & 30 | Targets moved to the mini vault. | Sic#39, Ta#59, C#2, UC# 32 &
30 have been moved from the spent target
vault to the mini vault. See the attached |
|