  RH-ISAC, Page 49 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check. Chad installed containment box back to
TM2 yesterday. We leak checked VCR joints
on window line.    No leak.
  
  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS. At SHC: HS line no leak . electrical check
result is fine. At TCS: helium pressurized
HS line to 70psi, 3 minutes. LD  leak
 Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf 
  2240   Tuesday, August 10, 2021, 10:16 Adam NewsomeSouth Hot-CellRepair  West Entrance Module Move to South Hot CellThe West Entrance Module has been moved
to the South Hot Cell for repair. 
  
  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module moveTM#4 with SiC#40 has been moved from the east
target station to the south hot cell.
  
  2263   Tuesday, November 09, 2021, 14:35 Adam NewsomeSouth Hot-CellStandard OperationTM2UCX#36Module MoveTM#2 was moved from ITW to SHC,
then moved back to ITW.
  
  2264   Wednesday, November 10, 2021, 08:29 Frank SongSouth Hot-CellStandard OperationTM2UC#36electrical check An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. 
 IMG_4322.JPG 
  2268   Monday, November 15, 2021, 12:15 Adam NewsomeSouth Hot-CellRepair  Squeaking noise during turntable rotation - chain misalignment and improper tensionIt was noted on Nov. 9 that a squeaking
noise was present when the turntable was
rotated CCW with a module present.
 PXL_20211119_190640081.jpg 
  2271   Friday, November 19, 2021, 12:48 Adam NewsomeSouth Hot-CellDevelopment  Vertical motion limit switch installationA rotary limit switch was installed, attached
to the shaft adjacent to the drive motor
for the vertical drive system. This limit
 PXL_20211119_172142852.jpg 
  2274   Tuesday, November 23, 2021, 10:58 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 MoveTM4 was moved from ITE to SHC. Shield plug
installed in ITE. 
  
  2275   Wednesday, November 24, 2021, 07:17 Frank SongSouth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connectionsthe TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. 
 IMG_4469.JPG 
  2291   Monday, January 17, 2022, 10:44 Frank SongSouth Hot-CellStandard OperationTM2UC#36 (the target removed)TM2 electrical check without Target. An electric check was done right
after module moving from SMP to SHC. 
 TM2_without_UCx36_at_SHC_(2).jpg 
  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit SwitchTwo changes have been made to the control
system to the South Hot Cell:

    Addition of two emergency
  
  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair Last week we repaired
the South Hot Cell turntable chain/sprocket.
 Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg 
  2314   Wednesday, April 13, 2022, 11:54 Carla BabcockSouth Hot-CellMaintenanceTM2 EZL cable changeChad changed the EZL cable and plugs on
TM2. New cable runs along the cable trays.
 MicrosoftTeams-image_(25).png 
  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET A Test Febiad Target was installed
and checked at SHC. 
 TEST_FEBIAD_TARGET_E_CHECK.jpg 
  2321   Wednesday, May 18, 2022, 13:52 Frank SongSouth Hot-CellStandard OperationTM4UCx#37electrical check  The TM4 with installed target #UCx37
had been electric checked at SHC. PICs attached.
 1.jpg2.jpg3.jpg 
  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections An electrical check was done at SHC
for TM2 with FEBIAD SiC #42 Target. 
 TM2_with_FEBIAD_SiC_42_electrical_check.jpg 
  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pinOn June 2 2022, while attempting to install
target SiC#42 a gasket fell off the water
line. I attempted to remove the target to
  
  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check TM2 with new target SiC#43 was electrical
checked at SHC. please see attachment.
 TM2_with_SiC43.jpg 
  2337   Wednesday, June 22, 2022, 09:14 David WangSouth Hot-CellStandard OperationTM2SiC#42 and SiC#43. Three of TM2 moves related to SiC#42 to SiC #43 target switching job. Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target
  