  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  413   Monday, July 29, 2013, 14:32 Travis CaveSpent Target VaultStandard Operation Ta#40Spent target moveSpent target Ta#40 has been placed into
storage. The target was placed in pail #107
and was put into slot 5A of the vault. It
 Vault_Storage_July_29_2013.pdf 
  282   Tuesday, April 02, 2013, 10:07 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 inserted into hot cellTa#39 has been inserted into the hot cell
in preparation for TM1 target change.
  
  285   Wednesday, April 03, 2013, 13:28 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 installedTa#39 has been installed onto TM1.   
  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical checkElectrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details.
 TM1_Ta39_SHC_ELEC_CHK.PDF 
  287   Thursday, April 04, 2013, 11:06 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39module moveTM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well.
  
  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for
 TM1_Ta39_CS_ELEC_CHK.PDF 
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and
 TM1_Ta39_CS_ELEC_CHK2.PDF 
  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been
 TM1_Ta39_CS_ELEC_CHK3.PDFTM1_Ta39_CS_ELEC_CHK4.PDFTM1_Ta39_CS_ELEC_CHK5.PDF 
  389   Thursday, June 27, 2013, 14:23 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 Autopsy performedAn autopsy of Ta#39 was performed yesterday
and today. Ta#39 will be sent to the spent
target storage vault on Tuesday.
  
  802   Wednesday, November 26, 2014, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29Spent targets moved to mini storageThe following targets have been moved to
the mini storage from the target storage
vault:
  
  115   Tuesday, June 05, 2012, 12:20 Bevan MossSouth Hot-CellStandard OperationTM1Ta#38Target inserted into HCTa#38 has been placed into the south hot
cell. Swipes of the tool port were taken
there was a count of 600 on the floor and
  
  118   Wednesday, June 06, 2012, 13:36 chad fisherSouth Hot-CellStandard OperationTM1Ta#38Target Change Nb#6 - Ta#38Nb#6 was removed from TM1...it looked very
clean.
Ta#38 was installed onto TM1...fit
  
  125   Monday, June 11, 2012, 14:14 Travis CaveConditioning StationStandard OperationTM1Ta#38Electrical checkElectrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details.
 TM#1_Ta38_at_constat_elec_check.PDF 
  127   Tuesday, June 19, 2012, 10:35 Travis CaveITWStandard OperationTM1Ta#38module moveTM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well.
  
  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module moveTM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move.
  
  158   Thursday, August 02, 2012, 11:48 Travis CaveSpent Target VaultStandard Operation Ta#38Spent target moveTa#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of
 Vault_Storage_August_2_2012.pdf 
  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical checkTM#1 has passed the the electrical check.  Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf 
  16   Thursday, July 28, 2011, 14:07 Travis CaveConditioning StationStandard OperationTM1Ta#37Module moveTm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well.
  
  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module moveTM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well.
  
  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target moveTa#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault.
  