Entry  Monday, July 29, 2013, 14:32, Travis Cave, Spent Target Vault, Standard Operation, , Ta#40, Spent target move Vault_Storage_July_29_2013.pdf
Spent target Ta#40 has been placed into storage. The target was placed in pail #107 and was put into slot 5A of the vault. It had a field of 224mSv/hr
upon removal from the south hot cell. See attached PDF for more details.
Entry  Tuesday, April 02, 2013, 10:07, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#39, Ta#39 inserted into hot cell 
Ta#39 has been inserted into the hot cell in preparation for TM1 target change.
Entry  Wednesday, April 03, 2013, 13:28, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#39, Ta#39 installed 
Ta#39 has been installed onto TM1.
Entry  Wednesday, April 03, 2013, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#39, Electrical check TM1_Ta39_SHC_ELEC_CHK.PDF
Electrical check on TM#1 with Ta#39 installed at the south hot cell. Target passed the electrical checks, see attached pdf for details.
Entry  Thursday, April 04, 2013, 11:06, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#39, module move 
TM#1 with Ta#39 has been moved from the south hot cell to the conditioning station move went well.
Entry  Monday, April 08, 2013, 09:01, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#39, Electrical check TM1_Ta39_CS_ELEC_CHK.PDF
TM#1 with Ta#39 at the conditioning station, has failed its electrical test see attached pdf for details. Also while setting up for the electrical test
one of the high powered flexible connectors popped out its crimp and another is working it out its crimp.
Entry  Monday, April 08, 2013, 12:10, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#39, Electrical check TM1_Ta39_CS_ELEC_CHK2.PDF
TM#1 with Ta#39 had the electrical check done on it again it passed, changes this time were the water lines were purged and it was under a better then
roughing vacuum. See the attached pdf for details.
Entry  Tuesday, April 09, 2013, 09:06, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#39, Electrical check TM1_Ta39_CS_ELEC_CHK3.PDFTM1_Ta39_CS_ELEC_CHK4.PDFTM1_Ta39_CS_ELEC_CHK5.PDF
TM#1 with Ta#39 has not passed it electrical check again, while sitting at the conditioning station at air. The readings have not been consistant. See
the current PDF for details.
 
Entry  Thursday, June 27, 2013, 14:23, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#39, Ta#39 Autopsy performed 
An autopsy of Ta#39 was performed yesterday and today. Ta#39 will be sent to the spent target storage vault on Tuesday.
 
 
Entry  Wednesday, November 26, 2014, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29, Spent targets moved to mini storage 
The following targets have been moved to the mini storage from the target storage vault:

    Ta#38
    Nb#7
    TiC#3
    SiC#29
    NiO#2

These target will be removed from
the mini storage and placed into the F-308's on December 3rd.
Entry  Tuesday, June 05, 2012, 12:20, Bevan Moss, South Hot-Cell, Standard Operation, TM1, Ta#38, Target inserted into HC 
Ta#38 has been placed into the south hot cell. Swipes of the tool port were taken there was a count of 600 on the floor and 150 on the walls and top. 
Entry  Wednesday, June 06, 2012, 13:36, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#38, Target Change Nb#6 - Ta#38 
Nb#6 was removed from TM1...it looked very clean.
Ta#38 was installed onto TM1...fit well.
Isaac Earle did this change with supervision in an effort to cross train.
Entry  Monday, June 11, 2012, 14:14, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#38, Electrical check TM#1_Ta38_at_constat_elec_check.PDF
Electrical check of TM#1 with Ta#38 at the conditioning station under vacuum. See attached file for details.
Entry  Tuesday, June 19, 2012, 10:35, Travis Cave, ITW, Standard Operation, TM1, Ta#38, module move 
TM#1 with Ta#38 moved from the conditioning station to the west target station. Move went well.
Entry  Tuesday, July 31, 2012, 10:50, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#38, module move 
TM#1 with Ta#38 has been moved from the west target station to the south hot cell, no problems with the move.
Entry  Thursday, August 02, 2012, 11:48, Travis Cave, Spent Target Vault, Standard Operation, , Ta#38, Spent target move Vault_Storage_August_2_2012.pdf
Ta#38 was moved from the south Hot Cell to the Spent Target Vault. Target is in pail #97, and was placed into tray 6 slot B of the vault. Field around
the pail upon removal from the Hot Cell were 226mSv/hr at about 1/2 metre. See attached PDF for vault details.
Entry  Thursday, July 28, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#37, Electrical check Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
TM#1 has passed the the electrical check.
Entry  Thursday, July 28, 2011, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#37, Module move 
Tm#1 with Ta#37 moved from the south hot cell to the conditioning station. Move went well.
Entry  Wednesday, August 03, 2011, 11:24, Travis Cave, ITW, Standard Operation, TM1, Ta#37, Module move 
TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well.
Entry  Wednesday, September 14, 2011, 10:32, Travis Cave, Spent Target Vault, Standard Operation, , Ta#37, Spent target move 
Ta#37 has been moved from the south hot cell into the storage vault. The target is in pail #89 and in spot 6A in the vault. It was 840uSv/hr upon removal
from the south hot cell. There are 7 free spots left in the vault.