413
|
Monday, July 29, 2013, 14:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#40 | Spent target move | Spent target Ta#40 has been placed into
storage. The target was placed in pail #107
and was put into slot 5A of the vault. It |
|
282
|
Tuesday, April 02, 2013, 10:07 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 inserted into hot cell | Ta#39 has been inserted into the hot cell
in preparation for TM1 target change. |
|
285
|
Wednesday, April 03, 2013, 13:28 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 installed | Ta#39 has been installed onto TM1. |
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
287
|
Thursday, April 04, 2013, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | module move | TM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well. |
|
290
|
Monday, April 08, 2013, 09:01 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for |
|
291
|
Monday, April 08, 2013, 12:10 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and |
|
293
|
Tuesday, April 09, 2013, 09:06 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been |
|
389
|
Thursday, June 27, 2013, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 Autopsy performed | An autopsy of Ta#39 was performed yesterday
and today. Ta#39 will be sent to the spent
target storage vault on Tuesday. |
|
802
|
Wednesday, November 26, 2014, 11:11 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38, Nb#7, TiC#3, NiO#2, and SiC#29 | Spent targets moved to mini storage | The following targets have been moved to
the mini storage from the target storage
vault: |
|
115
|
Tuesday, June 05, 2012, 12:20 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | Ta#38 | Target inserted into HC | Ta#38 has been placed into the south hot
cell. Swipes of the tool port were taken
there was a count of 600 on the floor and |
|
118
|
Wednesday, June 06, 2012, 13:36 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#38 | Target Change Nb#6 - Ta#38 | Nb#6 was removed from TM1...it looked very
clean.
Ta#38 was installed onto TM1...fit |
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check | Electrical check of TM#1 with Ta#38 at
the conditioning station under vacuum. See
attached file for details. |
|
127
|
Tuesday, June 19, 2012, 10:35 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 moved from the conditioning
station to the west target station. Move
went well. |
|
152
|
Tuesday, July 31, 2012, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move. |
|
158
|
Thursday, August 02, 2012, 11:48 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#38 | Spent target move | Ta#38 was moved from the south Hot Cell
to the Spent Target Vault. Target is in pail
#97, and was placed into tray 6 slot B of |
|
15
|
Thursday, July 28, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#37 | Electrical check | TM#1 has passed the the electrical check. |
|
16
|
Thursday, July 28, 2011, 14:07 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#37 | Module move | Tm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well. |
|
18
|
Wednesday, August 03, 2011, 11:24 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#37 | Module move | TM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well. |
|
27
|
Wednesday, September 14, 2011, 10:32 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#37 | Spent target move | Ta#37 has been moved from the south hot
cell into the storage vault. The target is