  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module movedYesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell.
  
  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target moveTa#46 was placed in the ISAC spent target
vault yesterday. See attached PDF for details.
 Vault_Storage_November_26_2015.pdf 
  867   Monday, March 23, 2015, 14:03 chad fisherSouth Hot-CellStandard Operation Ta#45Ta#45 inserted into hot cellTa#45 has been inserted into the hot cell.
Swipe taken of inner tool port area: 100000
counts/min.
  
  869   Tuesday, March 24, 2015, 09:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#45Ta#45 installedTa#45 has been installed onto TM4 and is
ready for leak and electrical check. High
current fasteners torqued to 130 in.lbs.
  
  870   Tuesday, March 24, 2015, 13:57 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical checkTM#4 electrical checks with and without
the target installed, installed target is
Ta#45.
 TM4_no_tgt_elec_chk_CS.PDFTM4_Ta45_elec_chk_SHC.PDF 
  872   Wednesday, March 25, 2015, 14:25 David WangSouth Hot-CellStandard OperationTM4Ta#45Leak check on TM4 HS water line with new Ta#45 target. at SHCChad and I leak checked TM4 HS water line
with new Ta#45 target installed at SHC. Leak
detector base leak rate 0.0Xe-9 atm.cc/sec,
  
  873   Wednesday, March 25, 2015, 14:34 David WangConditioning StationStandard OperationTM4Ta#45 TM4 and CS turbo- pumps are started .I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started
  
  874   Thursday, March 26, 2015, 09:20 Travis CaveConditioning StationStandard OperationTM4Ta#45Electrical checkElectrical check of TM#4 with Ta#45 at
the conditioning station, see attached pdf
for details.
 TM4_Ta#45_tgt_elec_chk_CS.PDF 
  875   Friday, March 27, 2015, 10:03 David WangConditioning StationStandard OperationTM4Ta#45Helium pressure test on TM4 HS line at CSThe helium pressure test on TM4 HS line
at conditioning station is done. No leak.
I also leak checked all vacuum seals on TM4
 001.JPG005.JPG006.JPG 
  876   Friday, March 27, 2015, 11:29 David WangConditioning StationStandard OperationTM4Ta#45TM4 is connected at CSTM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been 
 010.JPG013.JPG012.JPG 
  878   Monday, March 30, 2015, 09:03 Anders MjosConditioning StationStandard OperationTM4Ta#45Ta#45 ConditionoingMonday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched
 Ta#45_Conditioning.docx 
  880   Wednesday, April 01, 2015, 06:56 David WangConditioning StationStandard OperationTM4Ta#45TM4 has been disconnected at CS.TM4 has been disconnected at CS. The CS
and TM4 is venting for move. Anders stopped
vacuum and water system yesterday.
  
  881   Wednesday, April 01, 2015, 10:52 Travis CaveITEStandard OperationTM4Ta#45Module moveTM#4 with Ta#45 has been moved from the
conditioning station to the east target station.
  
  883   Wednesday, April 01, 2015, 13:12 David WangITEStandard OperationTM4Ta#45TM4 has been connected in ITETM4 has been connected in ITE. ITE six
turbo-pumps have been started. So far so
good.
  
  921   Monday, June 01, 2015, 11:23 Travis CaveITEStandard OperationTM4Ta#45Module movedTM#4 with Ta#45 has been moved from the
east target station to the south hot cell.
  
  922   Monday, June 01, 2015, 14:24 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical CheckPost beam electrical check on the Ta#45
target installed on TM#4. See attached PDF.
 TM4_Ta45_elecchk_postbeam.PDF 
  1078   Wednesday, September 23, 2015, 14:32 David WangConditioning StationStandard OperationTM4Ta#45Helium pressure test on TM4 HS line at CSHelium pressure test HS line at CS with
70 psi for 2 minutes. Base  leak rate
0.0xE-9atm.cc/sec. No response. The line
  
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installedUcx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4
  
  754   Wednesday, September 24, 2014, 10:41 Travis CaveITEStandard OperationTM4Ta#44module moveTM#4 with Ta#44 has been moved from the
south hot cell to the east target station.
  
  755   Wednesday, September 24, 2014, 15:03 David WangSouth Hot-CellStandard OperationTM4Ta#44Leak check on TM4 HS water line with new Ta#44 target. at SHCThis morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before
  