ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
878
|
Monday, March 30, 2015, 09:03 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | Ta#45 | Ta#45 Conditionoing | Monday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched |
|
880
|
Wednesday, April 01, 2015, 06:56 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 has been disconnected at CS. | TM4 has been disconnected at CS. The CS
and TM4 is venting for move. Anders stopped
vacuum and water system yesterday. |
|
881
|
Wednesday, April 01, 2015, 10:52 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module move | TM#4 with Ta#45 has been moved from the
conditioning station to the east target station. |
|
883
|
Wednesday, April 01, 2015, 13:12 |
David Wang | ITE | Standard Operation | TM4 | Ta#45 | TM4 has been connected in ITE | TM4 has been connected in ITE. ITE six
turbo-pumps have been started. So far so
good. |
|
921
|
Monday, June 01, 2015, 11:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#45 | Module moved | TM#4 with Ta#45 has been moved from the
east target station to the south hot cell. |
|
922
|
Monday, June 01, 2015, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical Check | Post beam electrical check on the Ta#45
target installed on TM#4. See attached PDF. |
|
1078
|
Wednesday, September 23, 2015, 14:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS | Helium pressure test HS line at CS with
70 psi for 2 minutes. Base leak rate
0.0xE-9atm.cc/sec. No response. The line |
|
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed | Ucx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4 |
|
754
|
Wednesday, September 24, 2014, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#44 | module move | TM#4 with Ta#44 has been moved from the
south hot cell to the east target station. |
|
755
|
Wednesday, September 24, 2014, 15:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Leak check on TM4 HS water line with new Ta#44 target. at SHC | This morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before |
|
756
|
Wednesday, September 24, 2014, 15:16 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | Reconnected TM4 in ITE. | TM4 has been reconnected back to ITE. I
started all turbo pumps on ITE and TM4. The
ITE TP4s was extremely difficult to start. |
|
790
|
Tuesday, November 18, 2014, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#44 | module move | TM#4 with Ta#44 has been moved from the
east target station to the south hot cell. |
|
792
|
Tuesday, November 18, 2014, 11:15 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | TM4 has been disconnected in ITE. | Dan and I disconnected TM4 in ITE. |
|
799
|
Friday, November 21, 2014, 10:40 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#44 | Spent target move | The spent Ta#44 target has been removed
from the south hot cell, it was placed in
pail #121 and placed in spot 4A of the storage |
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check | TM#1 with Ta#43 electrical check see attached
PDF. |
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
south hot cell to conditioning station. |
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
ITW to the south hot cell. |
|
742
|
Friday, September 05, 2014, 13:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#43 | Spent target move | Ta#43 has been moved from the south hot
cell to the spent target vault. See attached
PDF for details. |
|
630
|
Tuesday, March 25, 2014, 09:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Ta#42 install and "new" 9 pin | Ta#42 has been installed onto TM4. The
"new" 9 pin connector was not an
issue...attually went on better than any |
|
631
|
Tuesday, March 25, 2014, 13:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 was checked electrically with and
without target on it, see attached PDFs for
details. |
 |