Entry  Thursday, July 19, 2018, 09:17, chad fisher, South Hot-Cell, Repair, TM4, , New Optics Tray Modification 20180719_TM4_2.jpg20180709_TM4.jpg
The waterline loop bracket has been installed onto the new loop holding bracket and both installed onto the new source tray.
Entry  Tuesday, July 31, 2018, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, Nb#8, Module move 
 TM#2 with Nb#8 has been moved from ITW to the south hot cell.
Entry  Wednesday, August 01, 2018, 15:12, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Target mounted - water leak on HS line 20180801_180130904_iOS.jpg
The heat shield water lines were not purged ahead of target exchange  in the hot cell. This resulted in water leaking onto the new target  assembly (heat
shield) when the cooling lines were opened at top and  bottom (for connecting leak detector). Excess water was wiped up with  paper towels.
Entry  Tuesday, August 07, 2018, 10:44, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 
 The west entrance module has been moved from the west target station to the south hot cell, for a bellows replacement.
Entry  Monday, August 20, 2018, 09:55, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#56 and UC#23, Electrical Check Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf
 Electrical Checks of the last two targets Ta#56 and UC#23
Entry  Tuesday, August 28, 2018, 10:53, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#56, Module move 
 TM#4 with Ta#56 has been moved from the east station to the south hot cell.
Entry  Thursday, August 30, 2018, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#56, UC#24, and no target, Electrical Check TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdfTM#4_No_Target_Electrical_Check_Aug-29-2018.pdfTM#4_UC#24_Electrical_Check_SHC.pdf
 Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4.
Entry  Tuesday, September 18, 2018, 12:59, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#23, Module move 
 TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well.
Entry  Thursday, September 20, 2018, 08:36, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check Electrical_Chk_TM2_no_tgt_Sept-20-2018.pdf
 Results of the electrical check on TM#2 with no target after Chad cleaned out the bolt hole on the module where the target mounts.
Entry  Thursday, September 20, 2018, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1, Electrical Check Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
 TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results.
Entry  Monday, September 24, 2018, 10:21, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Post Irradiation Examination (PIE) 20180924_161322929_iOS.jpg
UC#23 experienced short between target and heat shield as it was heated during operation. The inspection of the target after irradiation revealed that
the left target leg was close to the heat shield opening and likely the cause of the short. Marks could be seen on the leg indicating contact. See attached
photo. More photos are available on DocuShare
Entry  Tuesday, September 25, 2018, 08:01, chad fisher, South Hot-Cell, Standard Operation, TM2, nSiC#1, nSiC#1 install 20180919_132304.jpg20180919_143535.jpg
On September 18th installation of nSiC#1 was attempted on TM2. As usual, new fasteners were tested previous to insertion into hot cell and employed during
installation. the last fastener to be installed was for the circuit D block. The fastener/air ratchet stalled immediately indicating a problem. The fastener
was removed and a an attempt was made trying a new spare fastener. That fastener also jammed right away but could not be removed or installed any further.
Entry  Tuesday, September 25, 2018, 08:48, chad fisher, South Hot-Cell, Maintenance, , , Window leak and torque hot_cell_window_gasket_change_procedure.pdf
The south hot cell window has been found to be leaking oil. Upon inspection yesterday I found that the bolts compressing the gasket on the cold side
were "loose". I have re-torqued them to the specification provided by the manufacturer in the attached procedure.
Entry  Tuesday, October 02, 2018, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#24, Module move 
 TM#4 with UC#24 has been moved from the east target station to the south hot cell.
Entry  Wednesday, October 03, 2018, 14:16, David Wang, South Hot-Cell, Standard Operation, TM4, Ta #57, Leak check TM4 Lp Ta# 57 at SHC. 
Tried to leak check TM4 Ta57# at TCS. LD failed to pump down properly at fine range. It always tripped at 4 torr. I cheeked all vacuum lines seals and
adapters on top of module to LD. Everything is good. Chad said the VCRs at SHC can not be tightened any more. Discussed with Anders, we decide to move
module TCS and helium pressure test there.  The same difficult happened last time on TM4 UCx24# at SHC when leak check. But,it is solved by pressurize
Entry  Tuesday, October 23, 2018, 10:53, chad fisher, South Hot-Cell, Repair, , , Exit 2 East 20181023_104541.jpg
Cover 1 was removed from the exit module. Confirmed with David that the actuator rod that needed to be disconnected was the far left )as viewed by the
hot cell operator). The fastener for this rod was un-accessible from this side. Cover 1 was re-installed (two bolts left loose) and cover 2 was removed.
fastener holding the actuator together was removed and luckily it does have a remote start.
Entry  Tuesday, October 23, 2018, 11:32, David Wang, South Hot-Cell, Maintenance, , , ITW RV4S leak check. 
ITW RV4S (A and B) are leak checked. They are good.  
Entry  Thursday, October 25, 2018, 11:03, chad fisher, South Hot-Cell, Repair, , , Exit 2 West 8x
Actuator arms, lemos, lemos and banana plug block have been disconnected in preparation for raising of the service tray. Aaron has pictures
Entry  Wednesday, October 31, 2018, 14:23, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1 and UC#25, Electrical Check Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdfElectrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf
 TM#2 with targets nSiC#1 (old target) and UC#25 (new target) electrical check results. See attached for details.
Entry  Thursday, November 08, 2018, 09:27, chad fisher, South Hot-Cell, Maintenance, , , South East Manipulator cable replacement 
The handle cable on the east manipulator of the south hot cell has been replaced. Old cable showed signs of wear but had no broken strands. Manipulator
is back together but still needs to be re-tensioned.