Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1774     Entry time: Thursday, August 30, 2018, 14:16
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#56, UC#24, and no target 
Subject: Electrical Check 

 Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4.

Attachment 1: TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf  141 kB  | Show | Hide all
Attachment 2: TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf  188 kB  | Show | Hide all
Attachment 3: TM#4_UC#24_Electrical_Check_SHC.pdf  172 kB  | Show | Hide all
ELOG V2.9.2-2455