Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1768     Entry time: Monday, August 20, 2018, 09:55
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#56 and UC#23 
Subject: Electrical Check 

 Electrical Checks of the last two targets Ta#56 and UC#23

Attachment 1: Electrical_Check_TM4_Ta56_SHC.pdf  162 kB  | Show | Hide all
Attachment 2: Electrical_Check_TM2_UC23_CS.pdf  132 kB  | Show | Hide all
Attachment 3: Electrical_Check_TM2_UC23_SHC.pdf  122 kB  | Show | Hide all
ELOG V2.9.2-2455