Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1746     Entry time: Friday, June 29, 2018, 10:27
Author: chad fisher 
Category: South Hot-Cell 
Type: Maintenance 
Module:  
Target/Number:  
Subject: South Hot Cell Filter Change 

At the end of manipulator repair Thursday the ventilation pre-filter in the hot cell was changed. Old filter remains in the hot cell until such time as it can be removed.

ELOG V2.9.2-2455