Entry  Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
 The results of the electrical check of TM#4 with UC#27 attached to it.
Entry  Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
 The results of the electrical check of TM#4 with UC#27 attached to it.
Entry  Thursday, September 05, 2019, 14:18, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UCx#27, TM4 Move 
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. 
Entry  Thursday, September 05, 2019, 11:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#27, UCx#27 install 
Dummy Ta target has been removed from TM4 and UCx#27 installed
Entry  Wednesday, September 04, 2019, 13:53, chad fisher, South Hot-Cell, Repair, TM4, , TM3 CB to TM4 
The TM3 containment box has been installed onto TM4. No issues, leak checked ok.
 
Entry  Tuesday, September 03, 2019, 10:49, Adam Newsome, South Hot-Cell, Standard Operation, TM4, , TM4 Move 
TM4 has been moved from the Conditioning Station to the South Hot-Cell.
Entry  Tuesday, September 03, 2019, 10:48, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move 
TM3 has been moved from the South Hot-Cell to the Middle-East silo. 
Entry  Thursday, August 29, 2019, 12:54, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move 
TM3 has been moved from the Middle-East silo to the South Hot Cell.
Entry  Tuesday, August 27, 2019, 13:12, Adam Newsome, Safe Module Parking, Development, , , SMP Remote Control Wiring Inspection 
The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF  electrician).  The module was plugged in to verify there were no
issues. No changes were suggested, and then wiring was approved.
Entry  Friday, August 23, 2019, 14:27, Isaac Earle, Safe Module Parking, Development, , , SMP camera video cabling installed and tested 
 Installation of the video lines for the SMP cameras was completed yesterday according to IRH1670 Rev B.  All four cameras were confirmed to
be displaying properly in the crane control room.  The cameras are powered from an outlet wired to circuit 35/37 on Panel #443 (located in the NHCSA). 
This is independent from the power supply for other existing camera systems in the Target Hall.  The SMP turntable was rotated through the full range
Entry  Thursday, August 22, 2019, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 
 TM#4 has been moved from the south west silo to the south hot cell.
Entry  Friday, August 16, 2019, 14:23, Carla Babcock, ITE, Repair, TM2, ZrC#8, TM2 electrical checks in ITE 
Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before
protons) and similar to 31uA right after protons went off on Aug. 6.
TGHT=0A
Entry  Friday, August 16, 2019, 08:52, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 is moved from TCS to SW silo. 
TM4 is moved from TCS to SW silo this morning. The move is good. 
Entry  Friday, August 16, 2019, 08:51, David Wang, Conditioning Station, Repair, TM4, , TM4 waterlines helium pressure test at TCS. 
LD base leak rate, 0.0Xe-9atm.cc/sec. Helium pressure, 70psi. 5 minutes each circuit. No response on all water line except containment box window which
has a VCR leak issue now. Window line leak rate, 2.3Xe-4 atm.cc/sec.
Entry  Friday, August 16, 2019, 08:46, David Wang, ITE, Standard Operation, TM4, ZrC #8., TM2 has been connected in ITE. 
TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.
Entry  Thursday, August 15, 2019, 09:45, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC#8, Electrical Check TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
 Electrical of TM#2 with ZrC#8 at the south hot cell. See attached for details.
Entry  Thursday, August 15, 2019, 09:36, Adam Newsome, ITE, Standard Operation, TM2, ZrC #8, TM2 Move 
TM2 was moved from South Hot Cell to ITE. ZrC #8 target. 
Entry  Wednesday, August 14, 2019, 11:43, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58 and no target., Results of electrical checks post beam at the south hot cell. TM2_elec_chk_Ta58_post_beam_shc.pdfTM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target
attached.
Entry  Wednesday, August 14, 2019, 08:55, David Wang, ITE, Standard Operation, TM2, , TM2 has been disconnected in ITE. 
TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time. 
Entry  Tuesday, August 13, 2019, 09:49, Adam Newsome, South Hot-Cell, Standard Operation, TM2, Ta 58, TM2 Move 
TM2 was moved from ITE to South Hot Cell. Tantalum 58 target. 