  2535   Friday, January 26, 2024, 11:57 David WangSafe Module ParkingStandard OperationTM4 TM4 coil1, 2, and HS electrical check at SMP after module moving.

TM4 coil1, 2 and HS are all OL at 250V at SMP after module move. This week, Chad and Carl fixed short issue on coil1, 2 and HS by insert dropped ultem ring back to position at SHC.

  454   Friday, September 13, 2013, 08:05 David WangSouth Hot-CellRepairTM4 TM4 coil 1 leak check in SHC

Leak checked TM4 coil1 in SHC with Isaac . The leak detector only can pump down to 1.5xE-7 atm.cc/sec. The leak detector got the response once the helium valve is open, not even close to the leak area. The leak detector got a very big response when the helium probe was put close to the coil terminal block on target front side and spray helium for 2 clicks. The leak detector got a small  response when the probe was put close to water block area and spray helium for 2 clicks. The leak is located on the front target side coil line but not from water blocks. The leak is too big to be further pin pointed by this method. See attachment

Attachment 1: TM4_coil_1_leak_check.pdf
TM4_coil_1_leak_check.pdf TM4_coil_1_leak_check.pdf
  731   Monday, August 11, 2014, 14:27 David WangConditioning StationStandard OperationTM4 TM4 are vented with argon and disconnected at CS.

TM4 are vented with argon and disconnected at CS this morning.

  1452   Thursday, March 16, 2017, 10:32 David WangSpent Target VaultRepairTM4 TM4 and its silo rust photos

I watched rust on TM4 and its silo. Most of rust are on est side of module and silo. See attachments

Attachment 1: humidity_in_TH_and_rusty_TM4_006.JPG
humidity_in_TH_and_rusty_TM4_006.JPG
Attachment 2: humidity_in_TH_and_rusty_TM4_007.JPG
humidity_in_TH_and_rusty_TM4_007.JPG
Attachment 3: humidity_in_TH_and_rusty_TM4_008.JPG
humidity_in_TH_and_rusty_TM4_008.JPG
Attachment 4: humidity_in_TH_and_rusty_TM4_009.JPG
humidity_in_TH_and_rusty_TM4_009.JPG
Attachment 5: humidity_in_TH_and_rusty_TM4_010.JPG
humidity_in_TH_and_rusty_TM4_010.JPG
Attachment 6: humidity_in_TH_and_rusty_TM4_011.JPG
humidity_in_TH_and_rusty_TM4_011.JPG
Attachment 7: humidity_in_TH_and_rusty_TM4_012.JPG
humidity_in_TH_and_rusty_TM4_012.JPG
Attachment 8: humidity_in_TH_and_rusty_TM4_013.JPG
humidity_in_TH_and_rusty_TM4_013.JPG
Attachment 9: humidity_in_TH_and_rusty_TM4_014.JPG
humidity_in_TH_and_rusty_TM4_014.JPG
Attachment 10: humidity_in_TH_and_rusty_TM4_015.JPG
humidity_in_TH_and_rusty_TM4_015.JPG
Attachment 11: humidity_in_TH_and_rusty_TM4_016.JPG
humidity_in_TH_and_rusty_TM4_016.JPG
Attachment 12: humidity_in_TH_and_rusty_TM4_017.JPG
humidity_in_TH_and_rusty_TM4_017.JPG
Attachment 13: humidity_in_TH_and_rusty_TM4_018.JPG
humidity_in_TH_and_rusty_TM4_018.JPG
  2633   Friday, July 05, 2024, 12:50 David WangSouth Hot-CellStandard OperationTM4TiC#7TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation .

TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation have been done.  all results are good. I will attach the checklist when printer is back to work.

TM4 HS line was helium pressure tested at TCS this morning. No leak. Also i leak checked TM4 top all air to  vacuum seals at TCS. Everything is good.

TiC #7 is a febiad target.TM4 top has been configured for febiad target. checked pin 2-2 to bias, target ,and chassis at 250V. they are all OL.  

 

  1258   Tuesday, June 07, 2016, 18:17 David WangConditioning StationStandard OperationTM4UC#16TM4 and TCS turbo pumps are started.

TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.

  621   Thursday, March 13, 2014, 07:35 David WangITWStandard OperationTM4 TM4 and ITW turbo pumps have been started

I connected ITW  vacuum system to TM4. TM4 and ITW turbo pumps have been started successfully. The pumping down is good so far.

  625   Wednesday, March 19, 2014, 15:46 David WangITWStandard OperationTM4 TM4 and ITE air to vacuum leak check and TM4 water lines helium test.

With TM4 located in ITW, All air to vacuum seals  on ITW primary and secondary vacuum vessels have been leak  checked with leak detector hooked directly onto the TM4 service cap.The base LR :00xE-9atm.cc/sec. The ITW IG1 was 1.16xE-6 torr which was good. No leak has been found during the checking.Also, the TM4 water lines(except HS) had been  pressurized with 70 psi helium on each for 2 minutes. There was no response during the test. The ITW and TM4 are good on leak checking.See attachment pictures

Attachment 1: 001.JPG
001.JPG
Attachment 2: 002.JPG
002.JPG
Attachment 3: 003.JPG
003.JPG
Attachment 4: 004.JPG
004.JPG
Attachment 5: 005.JPG
005.JPG
Attachment 6: 008.JPG
008.JPG
Attachment 7: 012.JPG
012.JPG
  929   Tuesday, June 02, 2015, 14:39 David WangConditioning StationStandard OperationTM4SiC #31TM4 and CS turbo- pumps are started .

TM4 and CS turbo-pumps are started this afternoon. Everything is good so far.

  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.

Connected leak detector to TM4 and CS vacuum system. The vacuum readings on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic box) 3.9xE-6 Torr. Leak detector base pressure:6.0xE-3 torr, base leak rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight.

  1256   Tuesday, June 07, 2016, 17:11 David WangConditioning StationStandard OperationTM4UC#16TM4 UCx16 electrical check and leak check at SHC

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Attachment 1: UCX_16_electrical_test.pdf
UCX_16_electrical_test.pdf UCX_16_electrical_test.pdf UCX_16_electrical_test.pdf
Attachment 2: electrical_check._TM4_UCx16_at_TCS..pdf
electrical_check._TM4_UCx16_at_TCS..pdf
  2118   Friday, July 03, 2020, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#30TM4 UCx#30 Electrical check and HS leak check

Electrical and leak check are good. See attachment.

Attachment 1: TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
  2057   Monday, February 03, 2020, 09:14 David WangITWStandard OperationTM4UCx 29TM4 UCx 29 disconnection checklist

TM4 has been disconnected in ITW. See attachment checklist.

Attachment 1: UCx29__disconnection_checklist.pdf
UCx29__disconnection_checklist.pdf UCx29__disconnection_checklist.pdf UCx29__disconnection_checklist.pdf
  2011   Wednesday, October 23, 2019, 06:56 David WangITWStandard OperationTM4UCX 28TM4 UCx 28 disconnection checklist

TM4 was disconnected in ITW.  See checklist.

Attachment 1: UCx_28_disonnection_CL.pdf
UCx_28_disonnection_CL.pdf UCx_28_disonnection_CL.pdf
  2151   Tuesday, September 29, 2020, 14:28 David WangSouth Hot-CellStandard OperationTM4UC#31TM4 UC#31 Electrical check and HS leak check

Tm4 UCx 31# electrical check result. See attachment.

Attachment 1: TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
TM4_UCx31_elctrical_and_leak_check_at_SHC..pdf
Attachment 2: Scanned_from_a_Xerox_Multifunction_Printer.pdf
Scanned_from_a_Xerox_Multifunction_Printer.pdf
  1737   Thursday, June 14, 2018, 11:37 David WangITEStandard OperationTM4UC#22TM4 UC 22# checklist.

See attachments

Attachment 1: TM4_UCx_22#_check_list.pdf
TM4_UCx_22#_check_list.pdf TM4_UCx_22#_check_list.pdf TM4_UCx_22#_check_list.pdf
  8   Tuesday, July 19, 2011, 12:25 maicodallavalleSouth Hot-CellStandard OperationTM4Ta36TM4 Ta36 Target was put into the south hot cell.

Ta36 was check by Maico and Chad.It was then carried into the anteroom.From the anteroom it was transferred into the south hot cell.

  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS.

At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD  leak rate 0.0xE-9atm.cc/sec , no response.

Attachment 1: Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
  9   Tuesday, July 19, 2011, 13:51 chad fisherSouth Hot-CellStandard OperationTM4Ta#36TM4 Ta#36 Leak Check Results

Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.

At 1:45pm RH was contacted to notify them that TM4 is ready to move.

Attachment 1: DOC.PDF
DOC.PDF
  1778   Friday, September 07, 2018, 10:47 David WangITERepairTM4UCx24TM4 TP2 replacement

TM4 TP2 could not be started  after module was connected back to ITE on Sep 04th. It was replaced with a new pump on Sep 05th. The new pump works fine.