Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 39 of 140  Not logged in ELOG logo
Entry  Friday, January 26, 2024, 11:57, David Wang, Safe Module Parking, Standard Operation, TM4, , TM4 coil1, 2, and HS electrical check at SMP after module moving. 
TM4 coil1, 2 and HS are all OL at 250V at SMP after module move. This week, Chad and Carl fixed short issue on coil1, 2 and HS by insert dropped ultem
ring back to position at SHC. 
Entry  Friday, September 13, 2013, 08:05, David Wang, South Hot-Cell, Repair, TM4, , TM4 coil 1 leak check in SHC TM4_coil_1_leak_check.pdf
Leak checked TM4 coil1 in SHC with Isaac . The leak detector only can pump down to 1.5xE-7 atm.cc/sec. The leak detector got the response once the helium
valve is open, not even close to the leak area. The leak detector got a very big response when the helium probe was put close to the coil terminal block
on target front side and spray helium for 2 clicks. The leak detector got a small  response when the probe was put close to water block area and spray
Entry  Monday, August 11, 2014, 14:27, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 are vented with argon and disconnected at CS. 
TM4 are vented with argon and disconnected at CS this morning.
Entry  Thursday, March 16, 2017, 10:32, David Wang, Spent Target Vault, Repair, TM4, , TM4 and its silo rust photos 13x
I watched rust on TM4 and its silo. Most of rust are on est side of module and silo. See attachments
Entry  Friday, July 05, 2024, 12:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC#7, TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation . 
TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation have been done.  all results are good. I will attach the
checklist when printer is back to work.
TM4 HS line was helium pressure tested at TCS this morning. No leak. Also i leak checked TM4 top all air to  vacuum seals at TCS. Everything
Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 
TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.
Entry  Thursday, March 13, 2014, 07:35, David Wang, ITW, Standard Operation, TM4, , TM4 and ITW turbo pumps have been started 
I connected ITW  vacuum system to TM4. TM4 and ITW turbo pumps have been started successfully. The pumping down is good so far.
Entry  Wednesday, March 19, 2014, 15:46, David Wang, ITW, Standard Operation, TM4, , TM4 and ITE air to vacuum leak check and TM4 water lines helium test. 7x
With TM4 located in ITW, All air to vacuum seals  on ITW primary and  secondary vacuum vessels have been leak  checked with leak detector 
hooked directly onto the TM4 service cap.The base LR :00xE-9atm.cc/sec.  The ITW IG1 was 1.16xE-6 torr which was good. No leak has been found  during the
checking.Also, the TM4 water lines(except HS) had been   pressurized with 70 psi helium on each for 2 minutes. There was no  response during the test.
Entry  Tuesday, June 02, 2015, 14:39, David Wang, Conditioning Station, Standard Operation, TM4, SiC #31, TM4 and CS turbo- pumps are started . 
TM4 and CS turbo-pumps are started this afternoon. Everything is good so far.
Entry  Friday, July 06, 2012, 14:38, David Wang, Conditioning Station, Standard Operation, TM4, UO#3, TM4 UO#3 target heat shield helium pressure check is done. 
Connected leak detector to TM4 and CS vacuum system. The vacuum readings  on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic  box) 3.9xE-6
Torr. Leak detector base pressure:6.0xE-3 torr, base leak  rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit  for 5 mins . There is
no response on leak detector. The heat shield  circuit is leak tight.
Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf
Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z"
repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment
 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2
Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
Electrical and leak check are good. See attachment. 
Entry  Monday, February 03, 2020, 09:14, David Wang, ITW, Standard Operation, TM4, UCx 29, TM4 UCx 29 disconnection checklist  UCx29__disconnection_checklist.pdf
TM4 has been disconnected in ITW. See attachment checklist. 
Entry  Wednesday, October 23, 2019, 06:56, David Wang, ITW, Standard Operation, TM4, UCX 28, TM4 UCx 28 disconnection checklist UCx_28_disonnection_CL.pdf
TM4 was disconnected in ITW.  See checklist.
Entry  Tuesday, September 29, 2020, 14:28, David Wang, South Hot-Cell, Standard Operation, TM4, UC#31, TM4 UC#31 Electrical check and HS leak check TM4_UCx31_elctrical_and_leak_check_at_SHC..pdfScanned_from_a_Xerox_Multifunction_Printer.pdf
Tm4 UCx 31# electrical check result. See attachment.
Entry  Thursday, June 14, 2018, 11:37, David Wang, ITE, Standard Operation, TM4, UC#22, TM4 UC 22# checklist. TM4_UCx_22#_check_list.pdf
See attachments
Entry  Tuesday, July 19, 2011, 12:25, maicodallavalle, South Hot-Cell, Standard Operation, TM4, Ta36, TM4 Ta36 Target was put into the south hot cell. 
Ta36 was check by Maico and Chad.It was then carried into the anteroom.From the anteroom it was transferred into the south hot cell.
Entry  Thursday, July 08, 2021, 11:45, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#62, TM4 Ta#62 leak check and lectrical check result at SHC and TCS.  Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD  leak rate 0.0xE-9atm.cc/sec
, no response. 
Entry  Tuesday, July 19, 2011, 13:51, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#36, TM4 Ta#36 Leak Check Results DOC.PDF
Tm4 w/ Ta#36 has been vacuum leak checked using the standard leak check procedure.
At 1:45pm RH was contacted to notify them that TM4 is ready to move.
Entry  Friday, September 07, 2018, 10:47, David Wang, ITE, Repair, TM4, UCx24, TM4 TP2 replacement 
TM4 TP2 could not be started  after module was connected back to ITE on Sep 04th. It was replaced with a new pump on Sep 05th. The new pump works
fine.
ELOG V2.9.2-2455